Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for March 29, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 84 Coastdown To Refueling Outage *
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 75 Increasing Power per Power Ascension Plan *
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100 Post Contingency Down Powers to 1100MW
Susquehanna 1 0 2022-03-28 Refueling Outage *
Susquehanna 2 100 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 0 2022-02-26 Refueling Outage;
Brunswick 1 0 2022-03-05 Refueling Outage
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 99 Coastdown To Refueling Outage *
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 93 Coastdown To Refueling Outage
McGuire 2 100
North Anna 1 100
North Anna 2 0 2022-03-06 Refueling Outage *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 99 Holding power due to condensate pump design margin issue.
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 0 2022-03-12 Refueling Outage
Vogtle 1 100
Vogtle 2 0 2022-03-06 Refueling Outage *
Watts Bar 1 100
Watts Bar 2 0 2022-03-02 Refueling Outage;

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 90 Coastdown To Refueling Outage *
Clinton 100
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 0 2022-03-05 Refueling Outage
Dresden 2 94 Reduced Power for Dispatch *
Dresden 3 100
Fermi 2 0 2022-02-05 Refueling Outage
LaSalle 1 96 Reduced Power for Dispatch *
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 98 Reduced Power For Maintenance *
Point Beach 1 0 2022-03-26 Refueling Outage
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 0 2022-03-21 Refueling Outage

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 60 Reduced Power for Dispatch *
Cooper 100
Diablo Canyon 1 0 2022-03-27 Refueling Outage
Diablo Canyon 2 100
Grand Gulf 1 0 2022-02-27 Refueling Outage
Palo Verde 1 97 Coastdown To Refueling Outage *
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 98 Coastdown To Refueling Outage *
Wolf Creek 1 70 Reduced Power for Dispatch *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.