Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2021-10-10 Refueling Outage *
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 100
Millstone 2 99 Increasing Power *
Millstone 3 100
Nine Mile Point 1 99 Reduced Power due to Discharge Temperature Restrictions
Nine Mile Point 2 100
Peach Bottom 2 100 1400 MVA restriction. *
Peach Bottom 3 79 Scheduled maintenance. *
Salem 1 100
Salem 2 0 2021-10-02 Refueling Outage
Seabrook 1 100
Susquehanna 1 91 Increasing power following rod pattern adjustment. *
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 98 Planned downpower for maintenance. *
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 89 Coastdown To Refueling Outage
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 29 Sync to the Grid *
Summer 0 2021-10-09 Refueling Outage
Surry 1 100
Surry 2 0 2021-10-24 Refueling Outage
Turkey Point 3 0 2021-10-09 Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 0 2021-10-29 Refueling Outage
Watts Bar 2 95 Holding power due to S/G conditions

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 99 100% Electrical Capability
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 0 2021-11-08 Refueling Outage
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2021-09-25 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 2021-10-03 Refueling Outage
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2021-10-09 Refueling Outage
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100 *
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.