The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 05, 2019

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 10/12/2019 SEE EN 54369 * 1
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 0 10/16/2019 REFUELING OUTAGE *
Indian Point 2 100
Indian Point 3 100
Limerick 1 99 REDUCED DUE TO PLANT CONDITIONS
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 0 10/20/2019 INCREASING POWER *
Salem 1 100
Salem 2 100
Seabrook 1 100 CONTINGENCY DOWNPOWER TO 1100 MW *
Susquehanna 1 100
Susquehanna 2 100
Three Mile Island 1 0 9/20/2019 REACTOR DEFUELED FOR PERMANENT SHUTDOWN

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 0 10/11/2019 REFUELING OUTAGE
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100
North Anna 2 100
Oconee 1 100
Oconee 2 81 COASTDOWN TO REFUELING OUTAGE *
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 10/13/2019 REFUELING OUTAGE *
Saint Lucie 2 100
Sequoyah 1 0 10/11/2019 REFUELING OUTAGE *
Sequoyah 2 100
Summer 100
Surry 1 0 10/18/2019 REFUELING OUTAGE
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 99 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100
D.C. Cook 2 0 10/2/2019 REFUELING OUTAGE *
Davis-Besse 100
Dresden 2 0 10/27/2019 REFUELING OUTAGE
Dresden 3 100
Duane Arnold 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 10/5/2019 REFUELING OUTAGE
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 9/21/2019 REFUELING OUTAGE
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 10/4/2019 REFUELING OUTAGE
River Bend Station 1 100
South Texas 1 100
South Texas 2 14 INCREASING POWER *
Waterford 3 100
Wolf Creek 1 0 9/21/2019 REFUELING OUTAGE *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, June 30, 2020