The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 03, 2019

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 80 COASTDOWN TO REFUELING OUTAGE *
Beaver Valley 2 100 *
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100 *
FitzPatrick 100
Ginna 100
Hope Creek 1 76 COASTDOWN TO REFUELING OUTAGE *
Indian Point 2 100
Indian Point 3 100 *
Limerick 1 100 *
Limerick 2 100 *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 85 COASTDOWN TO REFUELING OUTAGE
Salem 1 100
Salem 2 100
Seabrook 1 100 CONTINGENCY FOR LIMIT TO 900 MWE NET
Susquehanna 1 100 *
Susquehanna 2 100 *
Three Mile Island 1 0 9/20/2019 REACTOR DEFUELED FOR PERMANENT SHUTDOWN

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100 POWER SUPPLY ALERT *
Browns Ferry 2 0 9/20/2019 SEE EN 54302
POWER SUPPLY ALERT
*
Browns Ferry 3 100 POWER SUPPLY ALERT *
Brunswick 1 100
Brunswick 2 100
Catawba 1 100 YELLOW GRID HANDS OFF *
Catawba 2 0 9/14/2019 REFUELING OUTAGE *
Farley 1 0 9/29/2019 REFUELING OUTAGE *
Farley 2 100 LEVEL 1A SYSTEM ALERT *
Harris 1 91 COASTDOWN TO REFUELING OUTAGE
YELLOW GRID HANDS OFF
*
Hatch 1 100 CONSERVATIVE OPERATIONS WATCH *
Hatch 2 60 HOLDING POWER
CONSERVATIVE OPERATIONS WATCH
*
McGuire 1 100 YELLOW GRID HANDS OFF *
McGuire 2 100 YELLOW GRID HANDS OFF *
North Anna 1 89 INCREASING POWER *
North Anna 2 100 *
Oconee 1 100 YELLOW GRID HANDS OFF *
Oconee 2 100 YELLOW GRID HANDS OFF *
Oconee 3 100 YELLOW GRID HANDS OFF *
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 74 COASTDOWN TO REFUELING OUTAGE
POWER SERVICE ALERT
*
Sequoyah 2 100 POWER SERVICE ALERT *
Summer 100
Surry 1 100 *
Surry 2 100 *
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 CONSERVATIVE OPERATIONS WATCH
Vogtle 2 100 CONSERVATIVE OPERATIONS WATCH
Watts Bar 1 0 9/15/2019 SHUTDOWN FOR MAINTENANCE
Watts Bar 2 100 POWER SUPPLY ALERT *

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 89 HOLDING POWER *
Braidwood 2 100 *
Byron 1 100 *
Byron 2 100 *
Clinton 0 9/16/2019 REFUELING OUTAGE
D.C. Cook 1 80 INCREASING POWER *
D.C. Cook 2 0 10/2/2019 REFUELING OUTAGE *
Davis-Besse 100 *
Dresden 2 82 COASTDOWN TO REFUELING OUTAGE *
Dresden 3 100 *
Duane Arnold 100
Fermi 2 100
LaSalle 1 100 MAXIMUM EMERGENCY GENERATION ALERT
LaSalle 2 100 MAXIMUM EMERGENCY GENERATION ALERT
Monticello 100
Palisades 100
Perry 1 100 *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 73 COASTDOWN TO REFUELING OUTAGE
Quad Cities 1 100 *
Quad Cities 2 100 *

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 9/21/2019 REFUELING OUTAGE
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 98 COASTDOWN TO REFUELING OUTAGE
River Bend Station 1 100
South Texas 1 100
South Texas 2 96 COASTDOWN TO REFUELING OUTAGE *
Waterford 3 100
Wolf Creek 1 0 9/21/2019 REFUELING OUTAGE

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, June 30, 2020