Power Reactor Status Report for April 28, 2019
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 82 | DOWNPOWER DUE TO WATERBOX CLEANING | |||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 0 | 04/15/2019 | REFUELING OUTAGE | ||
| Millstone 2 | 36 | HOLDING POWER | * | ||
| Millstone 3 | 0 | 04/11/2019 | REFUELING OUTAGE | ||
| Nine Mile Point 1 | 45 | HOLDING POWER | * | ||
| Nine Mile Point 2 | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 0 | 04/12/2019 | REFUELING OUTAGE | ||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | CONTINGENCY FOR LIMIT TO 1100 MWE NET | |||
| Susquehanna 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Susquehanna 2 | 92 | INCREASING POWER HIGH SYSTEM VOLTAGE ACTION | * | ||
| Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE ACTION |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 87 | HOLDING POWER FOR TESTING | |||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 94 | MAXIMUM CAPABLE POWER | * | ||
| Brunswick 2 | 100 | * | |||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 0 | 04/07/2019 | REFUELING OUTAGE | ||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 15 | HOLDING POWER FOR MAINTENANCE NOT SYNCED TO THE GRID | * | ||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 0 | 04/25/2019 | SEE EN#54027 | ||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 | ||||
| Watts Bar 2 | 0 | 04/13/2019 | REFUELING OUTAGE |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 98 | INCREASING POWER | * | ||
| Clinton | 98 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 0 | 03/06/2019 | REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION | ||
| D.C. Cook 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Davis-Besse | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | * | |||
| Fermi 2 | 100 | ||||
| LaSalle 1 | 100 | ||||
| LaSalle 2 | 100 | ||||
| Monticello | 0 | 04/13/2019 | REFUELING OUTAGE | ||
| Palisades | 100 | ||||
| Perry 1 | 99 | DOWNPOWER DUE TO FLOW CONTROL VALVE ISSUES | * | ||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 40 | DOWNPOWER DUE TO FEEDWATER PUMP BEARING ISSUE | * | ||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 89 | REDUCED POWER FOR ROD PATTERN ADJUSTMENT | * | ||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 0 | 04/01/2019 | REFUELING OUTAGE | * | |
| Columbia Generating Station | 96 | COASTDOWN TO REFUELING OUTAGE | |||
| Comanche Peak 1 | 0 | 04/21/2019 | REFUELING OUTAGE | ||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 0 | 04/05/2019 | REFUELING OUTAGE | ||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend Station 1 | 0 | 03/29/2019 | REFUELING OUTAGE | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |