The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for December 09, 2018

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100      
Beaver Valley 2 100      
Calvert Cliffs 1 100      
Calvert Cliffs 2 100      
FitzPatrick 100      
Ginna 99   POWER REDUCED DUE TO OP DELTA T SPIKES    
Hope Creek 1 96   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Indian Point 2 100      
Indian Point 3 100   RESTRICTION ON TWO 13KV FEEDERS DUE TO 3RD 13KV FEEDER OUT OF SERVICE.    
Limerick 1 100      
Limerick 2 100      
Millstone 2 100      
Millstone 3 100      
Nine Mile Point 1 88   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Nine Mile Point 2 100      
Oyster Creek 0 09/17/2018 PERMANENTLY SHUTDOWN    
Peach Bottom 2 100      
Peach Bottom 3 100      
Pilgrim 1 100      
Salem 1 100      
Salem 2 100      
Seabrook 1 100      
Susquehanna 1 100      
Susquehanna 2 100   *  
Three Mile Island 1 100      

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 87   HOLDING POWER FOR EPU TESTING    
Browns Ferry 2 100      
Browns Ferry 3 100      
Brunswick 1 100      
Brunswick 2 95   INCREASING POWER *  
Catawba 1 0 11/16/2018 REFUELING OUTAGE    
Catawba 2 100      
Farley 1 100      
Farley 2 100      
Harris 1 100      
Hatch 1 93   REDUCED POWER FOR PLANNED MAINTENANCE *  
Hatch 2 98   COASTING DOWN UNTIL SCHEDULED ROD PATTERN ADJUSTMENT *  
McGuire 1 100      
McGuire 2 100      
North Anna 1 100      
North Anna 2 100      
Oconee 1 100   *  
Oconee 2 100      
Oconee 3 100      
Robinson 2 100      
Saint Lucie 1 100      
Saint Lucie 2 100      
Sequoyah 1 100      
Sequoyah 2 49   INCREASING POWER *  
Summer 100      
Surry 1 100      
Surry 2 100   *  
Turkey Point 3 100      
Turkey Point 4 100      
Vogtle 1 100      
Vogtle 2 100      
Watts Bar 1 100      
Watts Bar 2 100      

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100      
Braidwood 2 100      
Byron 1 100      
Byron 2 100      
Clinton 90   REDUCED POWER FOR SURVEILLANCE TESTING *  
D.C. Cook 1 100      
D.C. Cook 2 100      
Davis-Besse 100      
Dresden 2 100      
Dresden 3 93   INCREASING POWER FOLLOWING ROD SEQUENCE EXCHANGE *  
Duane Arnold 100      
Fermi 2 0 12/06/2018 OUTAGE DUE TO GENERATOR REPAIR    
LaSalle 1 100      
LaSalle 2 82   REDUCED POWER FOR ROD PATTERN ADJUSTMENT & SURVEILLANCE TESTING *  
Monticello 100      
Palisades 0 10/13/2018 REFUELING OUTAGE    
Perry 1 96   COASTDOWN TO REFUELING OUTAGE    
Point Beach 1 14   INCREASING POWER - NOT SYNCED TO GRID *  
Point Beach 2 100      
Prairie Island 1 100      
Prairie Island 2 100      
Quad Cities 1 80   REDUCED POWER FOR PLANNED MAINTENANCE *  
Quad Cities 2 100      

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100      
Arkansas Nuclear 2 100      
Callaway 100      
Columbia Generating Station 74   HOLDING POWER FOR TROUBLESHOOTING FEEDWATER TURBINE TRIP *  
Comanche Peak 1 100      
Comanche Peak 2 0 12/08/2018 REFUELING OUTAGE *  
Cooper 100      
Diablo Canyon 1 100      
Diablo Canyon 2 100      
Grand Gulf 1 100      
Palo Verde 1 100      
Palo Verde 2 100   *  
Palo Verde 3 100      
River Bend 1 97   CORE FLOW LIMITED COASTDOWN TO REFUELING OUTAGE    
South Texas 1 100      
South Texas 2 100      
Waterford 3 100      
Wolf Creek 1 100      

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021