The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 29, 2018

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100      
Beaver Valley 2 0 10/20/2018 REFUELING OUTAGE *  
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION *  
FitzPatrick 100   *  
Ginna 0 10/21/2018 REFUELING OUTAGE    
Hope Creek 1 100      
Indian Point 2 100      
Indian Point 3 100   13.8 kV BUS POWERED FROM ALTERNATE SOURCE    
Limerick 1 100      
Limerick 2 100      
Millstone 2 0 09/27/2018 REFUELING OUTAGE    
Millstone 3 100      
Nine Mile Point 1 100      
Nine Mile Point 2 100      
Oyster Creek 0 09/17/2018 PERMANENTLY SHUTDOWN    
Peach Bottom 2 3   HOLDING WHILE RESTORING SYSTEMS *  
Peach Bottom 3 100      
Pilgrim 1 100      
Salem 1 100      
Salem 2 0 10/11/2018 REFUELING OUTAGE *  
Seabrook 1 30   HOLDING FOR SURVEILLANCES *  
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100      

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 10/14/2018 REFUELING OUTAGE    
Browns Ferry 2 100      
Browns Ferry 3 18   INCREASING POWER *  
Brunswick 1 96   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Brunswick 2 100      
Catawba 1 97   COASTDOWN TO REFUELING OUTAGE *  
Catawba 2 100      
Farley 1 100      
Farley 2 100      
Harris 1 100      
Hatch 1 100      
Hatch 2 100      
McGuire 1 100      
McGuire 2 100      
North Anna 1 100      
North Anna 2 100      
Oconee 1 0 10/19/2018 REFUELING OUTAGE    
Oconee 2 100      
Oconee 3 100      
Robinson 2 0 09/22/2018 REFUELING OUTAGE    
Saint Lucie 1 100      
Saint Lucie 2 100      
Sequoyah 1 100      
Sequoyah 2 75   COASTDOWN TO REFUELING OUTAGE    
Summer 0 10/05/2018 REFUELING OUTAGE    
Surry 1 100      
Surry 2 0 10/26/2018 REFUELING OUTAGE    
Turkey Point 3 0 09/30/2018 REFUELING OUTAGE    
Turkey Point 4 100      
Vogtle 1 100      
Vogtle 2 100      
Watts Bar 1 0 10/27/2018 MANUAL REACTOR TRIP - SEE EN #53697    
Watts Bar 2 100      

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100      
Braidwood 2 0 10/07/2018 INVESTIGATING STARTUP ISSUES    
Byron 1 100      
Byron 2 100      
Clinton 0 10/28/2018 AUTOMATIC SCRAM - SEE EN #53698 MAINTENANCE OUTAGE * 1
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION *  
D.C. Cook 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Davis-Besse 100   HIGH SYSTEM VOLTAGE ALERT *  
Dresden 2 100      
Dresden 3 1   ENTERING REFUELING OUTAGE *  
Duane Arnold 100      
Fermi 2 60   INCREASING POWER *  
LaSalle 1 100      
LaSalle 2 100      
Monticello 100      
Palisades 0 10/13/2018 REFUELING OUTAGE    
Perry 1 100      
Point Beach 1 100      
Point Beach 2 83   INCREASING POWER *  
Prairie Island 1 65   INCREASING POWER *  
Prairie Island 2 100      
Quad Cities 1 100      
Quad Cities 2 100      

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100      
Arkansas Nuclear 2 0 09/16/2018 REFUELING OUTAGE    
Callaway 100      
Columbia Generating Station 100      
Comanche Peak 1 100      
Comanche Peak 2 100      
Cooper 0 09/29/2018 REFUELING OUTAGE    
Diablo Canyon 1 100      
Diablo Canyon 2 100      
Grand Gulf 1 100      
Palo Verde 1 100      
Palo Verde 2 0 10/05/2018 REFUELING OUTAGE    
Palo Verde 3 100      
River Bend 1 71   INCREASING POWER *  
South Texas 1 0 10/05/2018 REFUELING OUTAGE    
South Texas 2 100      
Waterford 3 100      
Wolf Creek 1 100      

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021