The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for August 17, 2018

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100      
Beaver Valley 2 100   *  
Calvert Cliffs 1 100      
Calvert Cliffs 2 100      
FitzPatrick 87   COASTDOWN TO REFUELING OUTAGE *  
Ginna 100      
Hope Creek 1 100      
Indian Point 2 100      
Indian Point 3 100      
Limerick 1 100      
Limerick 2 100      
Millstone 2 100      
Millstone 3 100      
Nine Mile Point 1 100      
Nine Mile Point 2 100      
Oyster Creek 70   COASTDOWN TO SHUTDOWN    
Peach Bottom 2 100   150 MVAR RESTRICTION FOR TURBINE VIBRATION COASTDOWN TO REFUELING OUTAGE    
Peach Bottom 3 100      
Pilgrim 1 90   REDUCED POWER DUE TO CONDENSER PARAMETERS *  
Salem 1 100      
Salem 2 100      
Seabrook 1 100      
Susquehanna 1 100      
Susquehanna 2 97   REDUCED POWER DUE TO ATMOSPHERIC CONDITIONS *  
Three Mile Island 1 100      

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 79   REDUCED POWER DUE TO HEATER TUBE LEAK    
Browns Ferry 2 100      
Browns Ferry 3 100      
Brunswick 1 100      
Brunswick 2 100      
Catawba 1 100      
Catawba 2 100      
Farley 1 100      
Farley 2 100      
Harris 1 100      
Hatch 1 100      
Hatch 2 100      
McGuire 1 100      
McGuire 2 100      
North Anna 1 100      
North Anna 2 100   *  
Oconee 1 100      
Oconee 2 100      
Oconee 3 100      
Robinson 2 100      
Saint Lucie 1 100      
Saint Lucie 2 83   COASTDOWN TO REFUELING OUTAGE    
Sequoyah 1 100      
Sequoyah 2 100      
Summer 100      
Surry 1 100      
Surry 2 100      
Turkey Point 3 100      
Turkey Point 4 100      
Vogtle 1 100   ISSUE WITH FEEDWATER HEATER HIGH LEVEL DUMP VALVE - ISOLATED & STABLE    
Vogtle 2 100      
Watts Bar 1 100      
Watts Bar 2 100      

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100      
Braidwood 2 100      
Byron 1 100      
Byron 2 100      
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100      
D.C. Cook 2 100      
Davis-Besse 100      
Dresden 2 100      
Dresden 3 100      
Duane Arnold 95   COASTDOWN TO REFUELING OUTAGE *  
Fermi 2 100      
LaSalle 1 100      
LaSalle 2 100      
Monticello 100      
Palisades 100      
Perry 1 98   POWER LIMITED BY CONDENSER TEMPERATURE RESTRICTIONS *  
Point Beach 1 100      
Point Beach 2 100      
Prairie Island 1 100      
Prairie Island 2 100      
Quad Cities 1 100      
Quad Cities 2 100      

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100      
Arkansas Nuclear 2 100      
Callaway 100      
Columbia Generating Station 100      
Comanche Peak 1 100      
Comanche Peak 2 99   LIMITED DUE TO FAILURE OF LEADING EDGE FLOW METER *  
Cooper 100      
Diablo Canyon 1 100      
Diablo Canyon 2 100      
Grand Gulf 1 95   INCREASING POWER *  
Palo Verde 1 100      
Palo Verde 2 100      
Palo Verde 3 100      
River Bend 1 70   REDUCED POWER FOR TROUBLESHOOTING OF INBOARD MSIV    
South Texas 1 100      
South Texas 2 100      
Waterford 3 100   ENERGY LOAD LEVEL RISK ALERT LEVEL 1    
Wolf Creek 1 60   REDUCED POWER FROM LOSS OF ONE 345 kV SWITCHYARD LINE - NOW RESTORED - INCREASE IN POWER EXPECTED TODAY *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021