Power Reactor Status Report for August 15, 2018

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100      
Beaver Valley 2 0 08/12/2018 FORCED OUTAGE    
Calvert Cliffs 1 100      
Calvert Cliffs 2 100      
FitzPatrick 88   COASTDOWN TO REFUELING OUTAGE    
Ginna 100      
Hope Creek 1 100      
Indian Point 2 100      
Indian Point 3 100      
Limerick 1 100      
Limerick 2 100      
Millstone 2 100      
Millstone 3 100      
Nine Mile Point 1 100      
Nine Mile Point 2 100      
Oyster Creek 70   COASTDOWN TO SHUTDOWN    
Peach Bottom 2 100   150 MVAR RESTRICTION FOR TURBINE VIBRATION COASTDOWN TO REFUELING OUTAGE    
Peach Bottom 3 100      
Pilgrim 1 92   INCREASING POWER TO 100% *  
Salem 1 100      
Salem 2 100      
Seabrook 1 100      
Susquehanna 1 100      
Susquehanna 2 100      
Three Mile Island 1 100      

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 79   REDUCED POWER DUE TO HEATER TUBE LEAK    
Browns Ferry 2 100      
Browns Ferry 3 100      
Brunswick 1 100      
Brunswick 2 100      
Catawba 1 100      
Catawba 2 100      
Farley 1 100      
Farley 2 100      
Harris 1 100      
Hatch 1 100      
Hatch 2 100      
McGuire 1 100      
McGuire 2 100      
North Anna 1 100      
North Anna 2 99   100% ELECTRICAL CAPABILITY    
Oconee 1 100      
Oconee 2 100      
Oconee 3 100      
Robinson 2 100      
Saint Lucie 1 100      
Saint Lucie 2 84   COASTDOWN TO REFUELING OUTAGE *  
Sequoyah 1 100      
Sequoyah 2 100      
Summer 100      
Surry 1 100      
Surry 2 100      
Turkey Point 3 100      
Turkey Point 4 90   INCREASING POWER TO 100% *  
Vogtle 1 100   ISSUE WITH FEEDWATER HEATER HIGH LEVEL DUMP VALVE - ISOLATED & STABLE    
Vogtle 2 100      
Watts Bar 1 100      
Watts Bar 2 100      

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100      
Braidwood 2 100      
Byron 1 100      
Byron 2 100      
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100      
D.C. Cook 2 100      
Davis-Besse 100      
Dresden 2 100      
Dresden 3 100      
Duane Arnold 94   HOLDING POWER    
Fermi 2 100      
LaSalle 1 100      
LaSalle 2 100      
Monticello 100      
Palisades 100      
Perry 1 100      
Point Beach 1 100      
Point Beach 2 100      
Prairie Island 1 100      
Prairie Island 2 100      
Quad Cities 1 100      
Quad Cities 2 100      

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100      
Arkansas Nuclear 2 100      
Callaway 100      
Columbia Generating Station 100      
Comanche Peak 1 100      
Comanche Peak 2 0 08/13/2018 FORCED OUTAGE SEE EN #53550    
Cooper 100      
Diablo Canyon 1 100      
Diablo Canyon 2 100      
Grand Gulf 1 94   HOLDING POWER    
Palo Verde 1 100      
Palo Verde 2 100      
Palo Verde 3 100      
River Bend 1 70   REDUCED POWER FOR TROUBLESHOOTING OF INBOARD MSIV *  
South Texas 1 100      
South Texas 2 100      
Waterford 3 100      
Wolf Creek 1 100      

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021