Power Reactor Status Report for May 10, 2018
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 15 | SYNCED TO THE GRID | * | ||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 3 | REFUELING OUTAGE | * | ||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 0 | 04/15/2018 | REFUELING OUTAGE | ||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | 150 MVAR RESTRICTION FOR TURBINE VIBRATION | |||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | * | |||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 93 | INCREASING POWER | * | ||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 0 | 05/06/2018 | PLANT STATUP IN PROGRESS | * | |
Browns Ferry 3 | 87 | HOLD FOR NRC REVIEW AFTER POWER UPRATE | * | ||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Farley 1 | 0 | 04/08/2018 | REFUELING OUTAGE | * | |
Farley 2 | 100 | ||||
Harris 1 | 2 | REFUELING OUTAGE | * | ||
Hatch 1 | 100 | ||||
Hatch 2 | 50 | REDUCED POWER - WATER BOX TUBE LEAK | |||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 0 | 04/20/2018 | REFUELING OUTAGE | ||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | * | |||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 0 | 04/20/2018 | REFUELING OUTAGE | ||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 | ||||
Watts Bar 2 | 58 | REDUCED POWER FOR PLANNED MAINTENANCE |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 0 | 04/29/2018 | REFUELING OUTAGE | ||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 0 | 05/07/2018 | MAN RX. TRIP SEE EN #53387 | * | |
Davis-Besse | 100 | ||||
Dresden 2 | 100 | * | |||
Dresden 3 | 100 | * | |||
Duane Arnold | 100 | ||||
Fermi 2 | 90 | HOLDING POWER FOR FEED PUMP VIBRATION ISSUES | |||
LaSalle 1 | 100 | ||||
LaSalle 2 | 100 | ||||
Monticello | 100 | * | |||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 70 | INCREASING POWER AFTER PLANNED TESTING | * | ||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | * | |||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 0 | 03/23/2018 | REFUELING OUTAGE | ||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Grand Gulf 1 | 0 | 04/06/2018 | REFUELING OUTAGE | ||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 0 | 03/30/2018 | REFUELING OUTAGE |