The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 29, 2018

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 04/15/2018 REFUELING OUTAGE    
Beaver Valley 2 100        
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION    
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 04/13/2018 HIGH SYSTEM VOLTAGE ACTION *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 0 04/15/2018 REFUELING OUTAGE    
Oyster Creek 100        
Peach Bottom 2 100   150 MVAR RESTRICTION FOR TURBINE VIBRATION    
Peach Bottom 3 100        
Pilgrim 1 0 04/27/2018 PLANNED SHUTDOWN DUE TO FEED REG VALVE ISSUES *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100   TWO CONTINGENCIES AWAY FROM DOWNPOWER (CONDITION WILL CONTINUE TO ~ MAY 1)    
Susquehanna 1 0 03/30/2018 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION    
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION    
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 85   HOLDING POWER FOLLOWING TESTING    
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 0 04/08/2018 REFUELING OUTAGE    
Farley 2 100        
Harris 1 0 04/06/2018 REFUELING OUTAGE    
Hatch 1 100     *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 04/20/2018 REFUELING OUTAGE    
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 0 04/06/2018 REFUELING OUTAGE    
Sequoyah 2 100        
Summer 100        
Surry 1 0 04/20/2018 REFUELING OUTAGE    
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 8   INCREASING POWER *  
Braidwood 2 100        
Byron 1 100        
Byron 2 90   DOWNPOWER PER DISPATCH REQUEST *  
Clinton 93   COASTDOWN TO REFUELING OUTAGE    
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION    
D.C. Cook 2 0 02/28/2018 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 04/14/2018 FORCED OUTAGE - DISASSEMBLING REACTOR FOR MAINTENANCE    
LaSalle 1 100        
LaSalle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 03/23/2018 REFUELING OUTAGE    
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 85   DOWNPOWER FOR ECONOMIC DISPATCH *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Grand Gulf 1 0 04/06/2018 REFUELING OUTAGE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 04/06/2018 REFUELING OUTAGE    
River Bend 1 100        
South Texas 1 100        
South Texas 2 84   INCREASING POWER *  
Waterford 3 100        
Wolf Creek 1 0 03/30/2018 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021