The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 19, 2018

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 04/15/2018 REFUELING OUTAGE    
Beaver Valley 2 100      
Calvert Cliffs 1 100      
Calvert Cliffs 2 100      
FitzPatrick 100      
Ginna 100      
Hope Creek 1 0 04/13/2018 REFUELING OUTAGE    
Indian Point 2 0 03/18/2018 STARTUP PHYSICS TESTING IN PROGRESS *  
Indian Point 3 100   ONE OFFSITE FEEDER OUT OF SERVICE - ONE FAILURE AWAY FROM LCO *  
Limerick 1 25   INCREASING POWER PER POWER ASCENSION PLAN *  
Limerick 2 100      
Millstone 2 100      
Millstone 3 96   PLANNED MAINTENANCE AND TURBINE VALVE TESTING IN PROGRESS *  
Nine Mile Point 1 100      
Nine Mile Point 2 0 04/15/2018 REFUELING OUTAGE    
Oyster Creek 100      
Peach Bottom 2 100   150 MVAR RESTRICTION FOR TURBINE VIBRATION    
Peach Bottom 3 100      
Pilgrim 1 23   INCREASING POWER PER POWER ASCENSION PLAN *  
Salem 1 100      
Salem 2 100      
Seabrook 1 100   ONE CONTINGENCY AWAY FROM DOWNPOWER (CONDITION WILL CONTINUE TO ~ MAY 1)    
Susquehanna 1 0 03/30/2018 REFUELING OUTAGE    
Susquehanna 2 100      
Three Mile Island 1 100      

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   OUTGOING LIMIT DUE TO 500 kV OOS    
Browns Ferry 2 100   OUTGOING LIMIT DUE TO 500 kV OOS    
Browns Ferry 3 85   OUTGOING LIMIT DUE TO 500 kV OOS TURBINE CONTROL VALVE TESTING IN PROGRESS *  
Brunswick 1 100      
Brunswick 2 85   TRANSMISSION SYSTEM WORK    
Catawba 1 100      
Catawba 2 100      
Farley 1 0 04/08/2018 REFUELING OUTAGE    
Farley 2 100      
Harris 1 0 04/06/2018 REFUELING OUTAGE    
Hatch 1 100      
Hatch 2 50   CONDENSER TUBE LEAK    
McGuire 1 100      
McGuire 2 100      
North Anna 1 95   INCREASING POWER *  
North Anna 2 100      
Oconee 1 100      
Oconee 2 100      
Oconee 3 85   COASTDOWN TO REFUELING OUTAGE    
Robinson 2 100      
Saint Lucie 1 100      
Saint Lucie 2 100      
Sequoyah 1 0 04/06/2018 REFUELING OUTAGE    
Sequoyah 2 100      
Summer 100      
Surry 1 88   COASTDOWN TO REFUELING OUTAGE    
Surry 2 100      
Turkey Point 3 100      
Turkey Point 4 100      
Vogtle 1 100      
Vogtle 2 100      
Watts Bar 1 100      
Watts Bar 2 100      

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 04/08/2018 REFUELING OUTAGE *  
Braidwood 2 100      
Byron 1 100      
Byron 2 100      
Clinton 96   COASTDOWN TO REFUELING OUTAGE    
D.C. Cook 1 100      
D.C. Cook 2 0 02/28/2018 REFUELING OUTAGE    
Davis-Besse 100      
Dresden 2 100      
Dresden 3 100      
Duane Arnold 100      
Fermi 2 0 04/14/2018 FORCED OUTAGE *  
LaSalle 1 100      
LaSalle 2 100      
Monticello 100      
Palisades 100      
Perry 1 100      
Point Beach 1 99   INCREASING POWER *  
Point Beach 2 100      
Prairie Island 1 100      
Prairie Island 2 100      
Quad Cities 1 100      
Quad Cities 2 100      

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 03/23/2018 REFUELING OUTAGE    
Arkansas Nuclear 2 100      
Callaway 100      
Columbia Generating Station 100      
Comanche Peak 1 100      
Comanche Peak 2 100      
Cooper 100      
Diablo Canyon 1 100      
Diablo Canyon 2 100      
Grand Gulf 1 0 04/06/2018 REFUELING OUTAGE    
Palo Verde 1 100      
Palo Verde 2 100      
Palo Verde 3 0 04/06/2018 REFUELING OUTAGE    
River Bend 1 100      
South Texas 1 100      
South Texas 2 0 03/24/2018 REFUELING OUTAGE    
Waterford 3 100   *  
Wolf Creek 1 0 03/30/2018 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.