Power Reactor Status Report for November 6, 2017

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100   HIGH SYSTEM VOLTAGE ACTION    
Beaver Valley 2 100   HIGH SYSTEM VOLTAGE ACTION    
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION    
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION    
FitzPatrick 58   REDUCED POWER FOR POWER SUPPRESSION TESTING *  
Ginna 100        
Hope Creek 1 100   HIGH SYSTEM VOLTAGE ACTION    
Indian Point 2 100        
Indian Point 3 0 11/03/2017 REACTOR TRIP; SEE EN#53052    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 10/12/2017 REFUELING OUTAGE    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   150 MVAR RESTRICTION FOR TURBINE VIBRATION    
Peach Bottom 3 0 10/22/2017 REFUELING OUTAGE    
Pilgrim 1 100        
Salem 1 0 10/12/2017 SCHEDULED REFUELING OUTAGE    
Salem 2 100        
Seabrook 1 100   CONTINGENCY DOWNPOWER IN EFFECT *  
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION    
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION    
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 99   FLOW LIMITED    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 0 10/15/2017 REFUELING OUTAGE    
Harris 1 100        
Hatch 1 100     *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 10/27/2017 REFUELING OUTAGE    
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 0 10/27/2017 REFUELING OUTAGE    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 98   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/12/2017 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION    
D.C. Cook 2 100   HIGH SYSTEM VOLTAGE ACTION    
Davis-Besse 100   HIGH SYSTEM VOLTAGE ACTION    
Dresden 2 0 10/29/2017 REFUELING OUTAGE    
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100     *  
LaSalle 1 100        
LaSalle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 10/13/2017 REFUELING OUTAGE    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 0 10/06/2017 REFUELING OUTAGE    
Columbia Generating Station 100        
Comanche Peak 1 0 10/08/2017 PLANT STARTUP IN PROGRESS. REACTOR IS CRITICAL. *  
Comanche Peak 2 100        
Cooper 82   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Grand Gulf 1 99   HOLDING UNTIL ROD PATTERN ADJUSTMENT    
Palo Verde 1 2   PLANT STARTUP IN PROGRESS *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021