The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 30, 2017

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 04/21/2017 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 0 04/23/2017 REFUELING OUTAGE    
Hope Creek 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Indian Point 2 100        
Indian Point 3 0 03/12/2017 REFUELING OUTAGE    
Limerick 1 100        
Limerick 2 0 04/16/2017 REFUELING OUTAGE    
Millstone 2 0 04/01/2017 REFUELING OUTAGE    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   LIMITED TO 25 MVAR DUE TO TURBINE VIBRATION    
Peach Bottom 3 100        
Pilgrim 1 0 04/09/2017 REFUELING OUTAGE    
Salem 1 100        
Salem 2 0 04/14/2017 REFUELING OUTAGE    
Seabrook 1 0 04/30/2017 REACTOR TRIP DURING STARTUP SEE EN 52718 * 1
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 81   HOLDING POWER FOR ROD SOAK *  
Brunswick 2 96   HOLDING POWER FOR CONDENSER VACUUM    
Catawba 1 0 04/28/2017 REFUELING OUTAGE    
Catawba 2 100     *  
Farley 1 100        
Farley 2 100        
Harris 1 100     *  
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100     *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 04/27/2017 REFUELING OUTAGE    
Summer 0 04/07/2017 REFUELING OUTAGE    
Surry 1 100        
Surry 2 93   COASTDOWN TO REFUELING OUTAGE *  
Turkey Point 3 89   INCREASING POWER PER POWER ASCENSION PLAN *  
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 0 03/18/2017 PLANT STARTUP IN PROGRESS *  
Watts Bar 2 0 03/20/2017 FORCED OUTAGE - CONDENSER REPAIRS IN PROGRESS    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 0 04/23/2017 REFUELING OUTAGE *  
Byron 1 100        
Byron 2 100        
Clinton 93   COASTDOWN TO REFUELING OUTAGE    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100     *  
LaSalle 1 100        
LaSalle 2 100        
Monticello 0 04/15/2017 REFUELING OUTAGE    
Palisades 0 04/23/2017 REFUELING OUTAGE    
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 04/26/2017 AUTOMATIC REACTOR TRIP- SEE EN#52710    
Arkansas Nuclear 2 0 03/28/2017 REFUELING OUTAGE    
Callaway 100        
Columbia Generating Station 75   REDUCED FOR ECONOMIC DISPATCH    
Comanche Peak 1 100        
Comanche Peak 2 0 04/02/2017 REFUELING OUTAGE    
Cooper 100        
Diablo Canyon 1 0 04/22/2017 REFUELING OUTAGE    
Diablo Canyon 2 100        
Grand Gulf 1 94   HOLD POWER FOR PLANT TESTING    
Palo Verde 1 100        
Palo Verde 2 0 04/07/2017 REFUELING OUTAGE - RELOAD CORE    
Palo Verde 3 100        
River Bend 1 65   FUEL RELIABILITY SUPPRESSION TESTING *  
South Texas 1 30   INCREASING POWER *  
South Texas 2 95   CLEANING CONDENSER WATER BOXES *  
Waterford 3 0 04/15/2017 REFUELING OUTAGE    
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021