The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for February 26, 2017

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 0 02/12/2017 REFUELING OUTAGE - CORE RELOAD IN PROGRESS    
FitzPatrick 54   INCREASING POWER *  
Ginna 100        
Hope Creek 1 65   INCREASING POWER *  
Indian Point 2 100        
Indian Point 3 100   138 kV FEEDER 96951 OOS    
Limerick 1 100        
Limerick 2 99   COASTDOWN TO REFUELING OUTAGE *  
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 80   COASTDOWN TO REFUELING OUTAGE    
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   LIMITED TO 25 MVAR DUE TO TURBINE VIBRATION    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 99   ROD PATTERN ADJUSTMENT *  
Susquehanna 2 91   COASTDOWN TO REFUELING OUTAGE *  
Three Mile Island 1 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 0 02/24/2017 ENTERING REFUELING OUTAGE *  
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 88   COASTDOWN TO REFUELING OUTAGE *  
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100     *  
Hatch 2 3   INCREASING POWER *  
McGuire 1 100        
McGuire 2 0 02/23/2017 TECH SPEC REQUIRED S/D. SEE EN #52573.    
North Anna 1 100        
North Anna 2 100        
Oconee 1 100     *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 02/24/2017 ENTERING REFUELING OUTAGE *  
Saint Lucie 1 100        
Saint Lucie 2 0 02/19/2017 REFUELING OUTAGE    
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 60   HIGH SYSTEM VOLTAGE ACTION MAINTENANCE ON CONDENSER TUBE LEAK *  
Dresden 2 86   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
LaSalle 1 100        
LaSalle 2 0 02/17/2017 REFUELING OUTAGE - DEFUELED    
Monticello 100        
Palisades 100        
Perry 1 86   COASTDOWN TO REFUELING OUTAGE *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 86   COASTDOWN TO REFUELING OUTAGE *  
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 95   REDUCED POWER FOR PLANNED MAINTENANCE *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Grand Gulf 1 76   CONDENSATE BOOSTER PUMP ISSUE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 0 01/27/2017 REFUELING OUTAGE    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.