The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 20, 2016

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 65   COASTDOWN TO REFUELING OUTAGE    
Ginna 100        
Hope Creek 1 87   HOLDING POWER DUE TO ONE FEED PUMP UNAVAILABLE *  
Indian Point 2 100        
Indian Point 3 100   TWO 138 KV AND TWO 13.8 KV FEEDERS ARE RESTRICTED WHILE THE 33332L 138 KV FEEDER IS OUT OF SERVICE    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 11/19/2016 REACTOR SCRAM DURING MAIN TURBINE TESTING SEE EN# 52381 * 1
Peach Bottom 2 100   LIMITED TO 50 MVAR DUE TO TURBINE VIBRATION CONCERNS    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100     *  
Susquehanna 1 100        
Susquehanna 2 81   INCREASING POWER AFTER PERFORMING ROD PATTERN ADJUSTMENT *  
Three Mile Island 1 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100     *  
Browns Ferry 3 100        
Brunswick 1 61   REDUCED POWER FOR POWER SUPPRESSION TESTING *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 13   MAKING PREPARATIONS FOR MAIN TURBINE STARTUP *  
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100     *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 11/05/2016 REFUELING OUTAGE - CORE RELOAD IN PROGRESS    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 87   TURBINE VALVE TESTING *  
Byron 1 100        
Byron 2 100        
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 0 10/05/2016 REFUELING OUTAGE    
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100     *  
LaSalle 1 100        
LaSalle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 10/15/2016 REACTOR IS CRITICAL *  
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 09/23/2016 REFUELING OUTAGE    
Arkansas Nuclear 2 96   INCREASING POWER *  
Callaway 100        
Columbia Generating Station 88   INCREASING POWER *  
Comanche Peak 1 100     *  
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 10/24/2016 PERMANENTLY DEFUELED    
Grand Gulf 1 0 09/08/2016 FORCED OUTAGE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 09/02/2016 REACTOR IS NOT CRITICAL *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021