Power Reactor Status Report for November 19, 2016
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 65 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 89 | HOLDING POWER AT 89% DUE TO ONE FEED PUMP UNAVAILABLE | |||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | TWO 138 KV AND TWO 13.8 KV FEEDERS ARE RESTRICTED WHILE THE 33332L 138 KV FEEDER IS OUT OF SERVICE | |||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | LIMITED TO 50 MVAR DUE TO TURBINE VIBRATION CONCERNS | |||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | CONTINGENCY TO REDUCE TO 850 MWe IF LOSE A FEEDER OR TO LESS THAN 800 MWe FOR GRID STABILITY ISSUES | |||
| Susquehanna 1 | 100 | ||||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 91 | INCREASING POWER AFTER ROD PATTERN ADJUSTMENT | * | ||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 64 | REDUCED POWER FOR POWER SUPPRESSION TESTING | |||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Farley 1 | 2 | STARTUP IN PROGRESS | * | ||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 94 | TURBINE TESTING | * | ||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 0 | 11/05/2016 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 | ||||
| Watts Bar 2 | 100 | * |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | * | |||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 99 | 100% ELECTRICAL CAPABILITY | * | ||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 0 | 10/05/2016 | REFUELING OUTAGE | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | * | |||
| Duane Arnold | 100 | ||||
| Fermi 2 | 77 | COMPLETED ROD PATTERN ADJUSTMENT. INCREASING POWER | * | ||
| LaSalle 1 | 100 | ||||
| LaSalle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 0 | 10/15/2016 | MAKING PREPARATIONS FOR STARTUP ON NOV 20 | * | |
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 0 | 09/23/2016 | REFUELING OUTAGE | ||
| Arkansas Nuclear 2 | 45 | REQUESTED DOWNPOWER FROM GRID OPERATOR DUE TO TRANSMISSION LINE ISSUES | * | ||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 79 | REDUCED POWER FOR TURBINE VALVE STROKE TESTING | * | ||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 10/24/2016 | PERMANENTLY DEFUELED | ||
| Grand Gulf 1 | 0 | 09/08/2016 | FORCED OUTAGE | ||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 0 | 09/02/2016 | EXITING REFUELING OUTAGE | * |