Power Reactor Status Report for November 18, 2016

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 66   COASTDOWN TO REFUELING OUTAGE    
Ginna 100        
Hope Creek 1 89   HOLDING POWER AT 89% DUE TO ONE FEED PUMP UNAVAILABLE *  
Indian Point 2 100        
Indian Point 3 100   TWO 138 KV AND TWO 13.8 KV FEEDERS ARE RESTRICTED WHILE THE 33332L 138 KV FEEDER IS OUT OF SERVICE    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   LIMITED TO 50 MVAR DUE TO TURBINE VIBRATION CONCERNS *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100   CONTINGENCY TO REDUCE TO 850 MWe IF LOSE A FEEDER OR TO LESS THAN 800 MWe FOR GRID STABILITY ISSUES    
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 64   REDUCED POWER FOR POWER SUPPRESSION TESTING *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 0 11/17/2016 TECH SPEC REQUIRED SHUTDOWN. SEE EN #52374 *  
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 11/05/2016 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 92   INCREASING POWER AFTER BEING REDUCED FOR MAINTENANCE *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 95   REDUCED DUE TO LOAD FOLLOWING *  
Braidwood 2 100        
Byron 1 100     *  
Byron 2 100        
Clinton 94   DISPATCH REQUEST *  
D.C. Cook 1 100        
D.C. Cook 2 0 10/05/2016 REFUELING OUTAGE    
Davis-Besse 100        
Dresden 2 100        
Dresden 3 81   INCREASING POWER *  
Duane Arnold 100        
Fermi 2 86   INCREASING POWER *  
LaSalle 1 100        
LaSalle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 10/15/2016 EXITING REFUELING OUTAGE *  
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 97   DISPATCH REQUEST *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 09/23/2016 REFUELING OUTAGE    
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 10/24/2016 PERMANENTLY DEFUELED    
Grand Gulf 1 0 09/08/2016 FORCED OUTAGE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 09/02/2016 EXITING REFUELING OUTAGE *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours