Power Reactor Status Report for October 9, 2016
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 0 | 09/23/2016 | REFUELING OUTAGE - MINIMUM GENERATION ALERT | * | |
| Beaver Valley 2 | 100 | MINIMUM GENERATION ALERT | * | ||
| Calvert Cliffs 1 | 100 | MINIMUM GENERATION ALERT | * | ||
| Calvert Cliffs 2 | 100 | MINIMUM GENERATION ALERT | * | ||
| FitzPatrick | 78 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | MINIMUM GENERATION ALERT - HIGH SYSTEM VOLTAGE ACTION | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 0 | 09/18/2016 | REFUELING OUTAGE | ||
| Peach Bottom 2 | 96 | 100 MVAR LIMIT FOR TURBINE BEARING VIBRATION COASTDOWN TO REFUELING OUTAGE | |||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | MINIMUM GENERATION ALERT - HIGH SYSTEM VOLTAGE ACTION | * | ||
| Susquehanna 2 | 80 | SLOWLY INCREASING POWER TO 88% - MINIMUM GENERATION ALERT - HIGH SYSTEM VOLTAGE ACTION | * | ||
| Three Mile Island 1 | 100 | MINIMUM GENERATION ALERT - HIGH SYSTEM VOLTAGE ACTION | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 09/30/2016 | REFUELING OUTAGE | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 52 | REDUCED POWER BASED ON GRID CONDITIONS | * | ||
| Brunswick 2 | 51 | REDUCED POWER BASED ON GRID CONDITIONS | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 30 | INCREASING POWER TO 100% | * | ||
| Farley 1 | 0 | 10/01/2016 | REFUELING OUTAGE | ||
| Farley 2 | 100 | ||||
| Harris 1 | 5 | REFUELING OUTAGE - UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER - SEE EN #52291 | * | ||
| Hatch 1 | 100 | HURRICANE STORM WATCH | * | ||
| Hatch 2 | 100 | HURRICANE STORM WATCH | * | ||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 0 | 09/10/2016 | REFUELING OUTAGE | ||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 0 | 10/08/2016 | FORCED OUTAGE - UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER WITH AUTOMATIC RX TRIP - SEE EN #52290 | * | 1 |
| Saint Lucie 1 | 0 | 09/25/2016 | REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS | * | |
| Saint Lucie 2 | 0 | 10/06/2016 | FORCED OUTAGE | * | |
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 0 | 10/08/2016 | FORCED OUTAGE - AUTOMATIC RX TRIP ON GENERATOR LOCKOUT - SEE EN #52292 | * | 1 |
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | HURRICANE STORM WATCH | * | ||
| Vogtle 2 | 99 | INCREASING POWER TO 100% - HURRICANE STORM WATCH | * | ||
| Watts Bar 1 | 100 | ||||
| Watts Bar 2 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 0 | 09/25/2016 | REFUELING OUTAGE | ||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 99 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| D.C. Cook 2 | 0 | 10/05/2016 | REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION | * | |
| Davis-Besse | 100 | MINIMUM GENERATION ALERT | * | ||
| Dresden 2 | 100 | ||||
| Dresden 3 | 81 | COASTDOWN TO REFUELING OUTAGE | |||
| Duane Arnold | 0 | 10/03/2016 | REFUELING OUTAGE | ||
| Fermi 2 | 100 | ||||
| LaSalle 1 | 100 | ||||
| LaSalle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 81 | SCHEDULED MAINTENANCE | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 0 | 09/23/2016 | REFUELING OUTAGE | ||
| Arkansas Nuclear 2 | 0 | 09/28/2016 | FORCED OUTAGE - RED TRAIN EDG REPAIRS IN PROGRESS | ||
| Callaway | 100 | ||||
| Columbia Generating Station | 88 | INCREASING POWER | * | ||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 0 | 09/24/2016 | REFUELING OUTAGE | ||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 90 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Grand Gulf 1 | 0 | 09/08/2016 | FORCED OUTAGE | ||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 0 | 10/07/2016 | REFUELING OUTAGE | * | |
| River Bend 1 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 0 | 10/08/2016 | REFUELING OUTAGE | * | |
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 0 | 09/02/2016 | REFUELING OUTAGE |