Power Reactor Status Report for September 11, 2016
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
| Beaver Valley 2 | 73 | DOWNPOWER DUE TO PROBLEMS WITH TURBINE VALVE #2 | * | ||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 86 | COASTDOWN TO REFUELING OUTAGE | |||
| Ginna | 100 | ||||
| Hope Creek 1 | 98 | DOWNPOWER DUE TO AMBIENT CONDITIONS | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 92 | DOWNPOWER DUE TO QUARTERLY VALVE TESTING | * | ||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Peach Bottom 2 | 100 | 100 MVAR LIMIT FOR TURBINE BEARING VIBRATION COASTDOWN TO REFUELING OUTAGE | |||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 0 | 09/06/2016 | TRIP DUE TO FEEDWATER CONTROL MALFUNCTION SEE EN #52223 | ||
| Salem 1 | 63 | DOWN POWER DUE TO STEAM GENERATOR FEED PUMP ISSUES | |||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | SINGLE CONTINGENCY LINE OUTAGE | |||
| Susquehanna 1 | 100 | ||||
| Susquehanna 2 | 98 | INCREASING POWER AFTER ROD PATTERN ADJUSTMENT | * | ||
| Three Mile Island 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 87 | COASTDOWN TO REFUELING OUTAGE | |||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | * | |||
| Catawba 2 | 0 | 09/09/2016 | REFUELING OUTAGE | * | |
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 50 | TURBINE TESTING PERFORMING CONDENSER REPAIRS | * | ||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 0 | 09/10/2016 | REFUELING OUTAGE | * | |
| North Anna 2 | 100 | * | |||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | * | |||
| Surry 2 | 100 | * | |||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 97 | CONDENSER BACKPRESSURE LIMITATIONS | * | ||
| Watts Bar 2 | 0 | 08/30/2016 | REACTOR TRIP DUE TO MAIN TRANSFORMER FIRE. SEE EN# 52210. |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 98 | COASTDOWN TO REFUELING OUTAGE | |||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 75 | DOWNPOWER DUE TO ENVIRONMENTAL CONDITIONS | * | ||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 09/09/2016 | PLANT TRIP. SEE EN #52232. | * | |
| Dresden 2 | 100 | ||||
| Dresden 3 | 90 | COASTDOWN TO REFUELING OUTAGE | |||
| Duane Arnold | 93 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Fermi 2 | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 74 | QUARTERLY SURVEILLANCE TESTING | * | ||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 94 | COASTDOWN TO REFUELING OUTAGE | |||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 87 | INCREASING POWER | * | ||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 90 | COASTDOWN TO REFUELING OUTAGE | |||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 0 | 09/08/2016 | TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO INOPERABLE RHR PUMP: SEE EN # 52225 | ||
| Palo Verde 1 | 0 | 09/07/2016 | FORCED OUTAGE - MAIN PZR SPRAY VALVE STUCK OPEN - MANUAL TRIP: SEE EN # 52226 | ||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 0 | 09/02/2016 | REFUELING OUTAGE |
Page Last Reviewed/Updated Thursday, August 27, 2026