Power Reactor Status Report for September 5, 2016
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 99 | COASTDOWN TO REFUELING OUTAGE MINIMUM GENERATION ALERT | * | ||
| Beaver Valley 2 | 100 | MINIMUM GENERATION ALERT | * | ||
| Calvert Cliffs 1 | 100 | HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT | * | ||
| Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT | * | ||
| FitzPatrick | 87 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | COASTDOWN TO REFUELING OUTAGE | |||
| Peach Bottom 2 | 100 | 100 MVAR LIMIT FOR TURBINE BEARING VIBRATION COASTDOWN TO REFUELING OUTAGE | |||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 60 | DOWNPOWER DUE TO STEAM GENERATOR FEED PUMP ISSUES | |||
| Salem 2 | 0 | 08/31/2016 | TRIP DUE TO LOSS OF REACTOR COOLANT PUMP SEE EN #52213 | ||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT | * | ||
| Susquehanna 2 | 100 | HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT | * | ||
| Three Mile Island 1 | 91 | HIGH SYSTEM VOLTAGE ACTION REDUCED POWER FOR LOAD FOLLOWING MINIMUM GENERATION ALERT | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 89 | COASTDOWN TO REFUELING OUTAGE | |||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 95 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 97 | COASTDOWN TO REFUELING OUTAGE | * | ||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 1 | COMMENCE STARTUP | * | ||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 97 | CONDENSER BACKPRESSURE LIMITATIONS | * | ||
| Watts Bar 2 | 0 | 08/30/2016 | REACTOR TRIP DUE TO MAIN TRANSFORMER FIRE. SEE EN# 52210. |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 79 | REDUCED POWER FOR ROD PATTERN ADJUSTMENT | |||
| D.C. Cook 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| D.C. Cook 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Davis-Besse | 100 | MINIMUM GENERATION ALERT | * | ||
| Dresden 2 | 100 | ||||
| Dresden 3 | 92 | COASTDOWN TO REFUELING OUTAGE | |||
| Duane Arnold | 95 | COASTDOWN TO REFUELING OUTAGE | |||
| Fermi 2 | 100 | * | |||
| La Salle 1 | 100 | * | |||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | * | |||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 93 | COASTDOWN TO REFUELING OUTAGE | |||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 0 | 09/02/2016 | SHUTDOWN DUE TO RCS LEAK, SEE EN 52218 |
Page Last Reviewed/Updated Thursday, August 27, 2026