The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for July 18, 2016

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100     *  
Beaver Valley 2 100     *  
Calvert Cliffs 1 100   HOT WEATHER ALERT *  
Calvert Cliffs 2 100   HOT WEATHER ALERT *  
FitzPatrick 84   CONDENSATE BOOSTER PUMP MAINTENANCE    
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100   13.8 kV and 138 kV FEEDER RESTRICTIONS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   100 MVAR LIMIT FOR TURBINE BEARING VIBRATION    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 0 04/14/2016 REFUELING OUTAGE    
Salem 2 13   TURBINE OFFLINE FOR TROUBLE SHOOTING    
Seabrook 1 100        
Susquehanna 1 100   HOT WEATHER ALERT *  
Susquehanna 2 100   HOT WEATHER ALERT *  
Three Mile Island 1 100     *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   CONSERVATIVE OPERATING ALERT *  
Browns Ferry 2 100   CONSERVATIVE OPERATING ALERT *  
Browns Ferry 3 100   CONSERVATIVE OPERATING ALERT *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100   HOT WEATHER ALERT *  
North Anna 2 100   HOT WEATHER ALERT *  
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100   CONSERVATIVE OPERATING ALERT *  
Sequoyah 2 100   CONSERVATIVE OPERATING ALERT *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 95   CONDENSER BACK PRESSURE ISSUES CONSERVATIVE OPERATING ALERT *  
Watts Bar 2 14   CONSERVATIVE OPERATING ALERT *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100     *  
D.C. Cook 2 100     *  
Davis-Besse 100   HOT WEATHER ALERT IN EFFECT AT 0800 EDT *  
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 97   REDUCED DUE TO ENVIRONMENTAL CONDITIONS *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 0 07/10/2016 REPAIRING TURBINE CONTROL ISSUE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021