Power Reactor Status Report for April 9, 2016

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 0 03/07/2016 REFUELING OUTAGE    
Indian Point 3 100        
Limerick 1 0 03/20/2016 REFUELING OUTAGE    
Limerick 2 100        
Millstone 2 100        
Millstone 3 96   COASTDOWN TO REFUELING OUTAGE *  
Nine Mile Point 1 100        
Nine Mile Point 2 100   COASTDOWN TO REFUELING OUTAGE *  
Oyster Creek 100        
Peach Bottom 2 70   100 MVAR RESTRICTION DUE TO TURBINE BEARING VIBRATIONS REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100   ONE CONTINGENCY AWAY FROM DOWNPOWER TO 800MW    
Susquehanna 1 0 03/12/2016 REFUELING OUTAGE    
Susquehanna 2 100     *  
Three Mile Island 1 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 91   HOLDING POWER PENDING COMPLETION OF CORRECTIVE ACTIONS - SEE EN # 51850    
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 89   COASTDOWN TO REFUELING OUTAGE *  
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 03/18/2016 REFUELING OUTAGE - CORE RELOAD IN PROGRESS    
McGuire 2 100        
North Anna 1 100        
North Anna 2 0 03/06/2016 REFUELING OUTAGE *  
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 0 03/29/2016 REFUELING OUTAGE    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 0   MAKING PREPARATIONS FOR STARTUP *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 98   COASTDOWN TO REFUELING OUTAGE *  
Clinton 98   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/22/2016 REFUELING OUTAGE    
D.C. Cook 2 100        
Davis-Besse 0 03/25/2016 REFUELING OUTAGE    
Dresden 2 100     *  
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100     *  
Palisades 100        
Perry 1 100        
Point Beach 1 74   AWAITING SECONDARY CHEMISTRY RESULTS *  
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 65   INCREASING POWER TO 100% *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 0 04/02/2016 REFUELING OUTAGE    
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100     *  
Palo Verde 1 0 04/08/2016 REFUELING OUTAGE *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100     *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021