Power Reactor Status Report for December 20, 2015

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100     *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 0 12/19/2015 INCREASING POWER * 1
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   100 MVAR RESTRICTION DUE TO TURBINE BEARING VIBRATIONS *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100   ONE CONTINGENCY AWAY FROM OPERATING AT 800 MW (PER LOAD DISPATCH)    
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 92   COASTDOWN TO REFUELING OUTAGE *  
Brunswick 1 100   COASTDOWN TO REFUELING OUTAGE    
Brunswick 2 100     *  
Catawba 1 97   HOLD FOR DELTA T NORMALIZATION *  
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 98   COASTDOWN TO REFUELING OUTAGE    
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 46   HOLDING DUE TO HYDROGEN COOLING ISSUE ON MAIN GENERATOR *  
Sequoyah 2 80   INCREASING POWER FOLLOWING HIGH PRESSURE STEAM LINE LEAK REPAIR *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 0        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 80   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100     *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 12/17/2015 AUTO REACTOR TRIP AND UNUSUAL EVENT DUE TO FIRE - SEE EN #51609 FORCED OUTAGE    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 92   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 98   POWER SUPPRESSION TESTING *  
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 4   INCREASING POWER *  
South Texas 2 100        
Waterford 3 96   HOLDING POWER FOR FEEDWATER HEATER STRING REPAIRS *  
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.