Power Reactor Status Report for November 20, 2015

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 100     *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100     *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   MAINTAIN < 100 MVARS DUE TO VIBRATION ISSUE ON UNIT 2 MAIN GENERATOR    
Peach Bottom 3 85   REDUCED POWER FOR MAINTENANCE ON THE 'B' REACTOR FEED PUMP    
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 10/22/2015 REFUELING OUTAGE    
Seabrook 1 100     *  
Susquehanna 1 26   INCREASING POWER *  
Susquehanna 2 100     *  
Three Mile Island 1 0 10/29/2015 REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 11/15/2015 STARTUP IN PROGRESS. RX IS CRITICAL *  
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100     *  
Catawba 1 95   ENGINEERING HOLD *  
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 11/17/2015 SCHEDULED FORCED MAINTENANCE OUTAGE - ADDRESS TURBINE BLADE ISSUES    
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 11/13/2015 REFUELING OUTAGE    
Summer 0 10/02/2015 REFUELING OUTAGE    
Surry 1 99   INCREASING POWER *  
Surry 2 0 10/18/2015 REFUELING OUTAGE    
Turkey Point 3 0 10/18/2015 REFUELING OUTAGE STARTUP TRANSFORMER UNAVAILABLE SEE EN #51551    
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 0   OPERATING LICENSE ISSUED 10/22/15 - AWAITING INITIAL CORE LOAD    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100     *  
Clinton 99   100% ELECTRICAL GENERATION    
D.C. Cook 1 100        
D.C. Cook 2 100     *  
Davis-Besse 100        
Dresden 2 1   STARTUP IN PROGRESS *  
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 09/13/2015 REFUELING OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100     *  
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 10/16/2015 REFUELING OUTAGE    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100     *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 81   INCREASING POWER ROD SEQUENCE EXCHANGE COMPLETE *  
Palo Verde 1 100        
Palo Verde 2 100     *  
Palo Verde 3 100        
River Bend 1 94   HOLDING POWER FOR SCHEDULED DOWNPOWER TODAY *  
South Texas 1 0 10/17/2015 COOLDOWN TO MODE 5 IN PROGRESS *  
South Texas 2 100        
Waterford 3 0 10/25/2015 REFUELING OUTAGE - FUEL MOVEMENT IN PROGRESS    
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021