Power Reactor Status Report for November 17, 2015

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION    
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100   HIGH SYSTEM VOLTAGE ACTION    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100     *  
Peach Bottom 2 100   MAINTAIN < 100 MVARS DUE TO VIBRATION ISSUE ON UNIT 2 MAIN GENERATOR    
Peach Bottom 3 91   EPU TESTING HOLD    
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 10/22/2015 REFUELING OUTAGE    
Seabrook 1 94   HOLDING FOR REACTOR ENGINEERING CALCULATIONS *  
Susquehanna 1 0 11/12/2015 REACTOR SCRAM DUE TO MSIV CLOSURE - SEE EN# 51532 HIGH SYSTEM VOLTAGE ACTION    
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION    
Three Mile Island 1 0 10/29/2015 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 11/15/2015 PLANNED OUTAGE    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 11/17/2015 SCHEDULED FORCED MAINTENANCE OUTAGE - ADDRESS TURBINE BLADE ISSUES *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 11/13/2015 REFUELING OUTAGE    
Summer 0 10/02/2015 REFUELING OUTAGE    
Surry 1 0 10/13/2015 FORCED OUTAGE *  
Surry 2 0 10/18/2015 REFUELING OUTAGE    
Turkey Point 3 0 10/18/2015 REFUELING OUTAGE    
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 0   OPERATING LICENSE ISSUED 10/22/15 - AWAITING INITIAL CORE LOAD    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 78   LOAD DROP PER DISPATCHER ORDER *  
Byron 2 71   LOAD DROP PER DISPATCHER ORDER    
Clinton 99   100% ELECTRICAL GENERATION    
D.C. Cook 1 100        
D.C. Cook 2 96   FW HEATER TUBE LEAK    
Davis-Besse 100        
Dresden 2 0 11/01/2015 REFUELING OUTAGE    
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 09/13/2015 REFUELING OUTAGE *  
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 10/16/2015 REFUELING OUTAGE    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 68   INCREASING POWER *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 86   HOLDING POWER FOR CORE TESTING *  
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 80   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Palo Verde 1 100        
Palo Verde 2 58   GENERATOR IS CONNECTED TO THE GRID - HOLDING POWER FOR ENGINEERING TESTING *  
Palo Verde 3 100        
River Bend 1 88   INCREASING POWER *  
South Texas 1 0 10/17/2015 UNUSUAL EVENT DUE TO RCS LEAKAGE SEE EN# 51536 - REACTOR STARTUP DELAYED DUE TO REACTOR COLANT PUMP REPAIR    
South Texas 2 100        
Waterford 3 0 10/25/2015 REFUELING OUTAGE    
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.