The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 10, 2015

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION *  
FitzPatrick 100        
Ginna 100     *  
Hope Creek 1 80   LIMITED BY PGM .    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 92   INCREASING POWER *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   MAINTAIN < 100 MVARS ON UNIT 2    
Peach Bottom 3 91   EPU TESTING HOLD    
Pilgrim 1 100        
Salem 1 85   REDUCED POWER TO SUPPORT UNIT 2 OUTAGE    
Salem 2 0 10/22/2015 REFUELING OUTAGE    
Seabrook 1 0 09/30/2015 REFUELING OUTAGE    
Susquehanna 1 99   REDUCE POWER FOR RECIRC M-G SET REPAIRS HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 0 10/29/2015 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 0 11/07/2015 PLANNED MAINTENANCE-RECIRCULATION PUMP SEAL REPAIR    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 0 11/07/2015 PLANNED MAINTENANCE-CONTAINMENT LEAKAGE    
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 10/16/2015 REFUELING OUTAGE    
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 81   COASTDOWN TO REFUELING OUTAGE *  
Summer 0 10/02/2015 REFUELING OUTAGE    
Surry 1 0 10/13/2015 FORCED OUTAGE    
Surry 2 0 10/18/2015 REFUELING OUTAGE    
Turkey Point 3 0 10/18/2015 REFUELING OUTAGE    
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 0 11/06/2015 PLANNED MAINTENANCE OUTAGE    
Watts Bar 2 0   OPERATING LICENSE ISSUED 10/22/15 - AWAITING INITIAL CORE LOAD    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 77   LOAD DROP PER DISPATCHER ORDER *  
Byron 2 95   LOAD DROP PER DISPATCHER ORDER *  
Clinton 99   100% ELECTRICAL GENERATION    
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION *  
D.C. Cook 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Davis-Besse 100   HIGH SYSTEM VOLTAGE ACTION *  
Dresden 2 0 11/01/2015 REFUELING OUTAGE    
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 09/13/2015 REFUELING OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 10/16/2015 REFUELING OUTAGE    
Quad Cities 1 86   LOAD DROP PER DISPATCHER ORDER *  
Quad Cities 2 86   LOAD DROP PER DISPATCHER ORDER *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 09/20/2015 REFUELING OUTAGE    
Callaway 100        
Columbia Generating Station 100     *  
Comanche Peak 1 100        
Comanche Peak 2 0 10/03/2015 REFUELING OUTAGE PREPARE FOR STARTUP *  
Cooper 100        
Diablo Canyon 1 48   INCREASING POWER *  
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 10/09/2015 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 0 10/17/2015 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 0 10/25/2015 REFUELING OUTAGE    
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021