Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for October 9, 2015

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 09/25/2015 REFUELING OUTAGE    
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ALERT *  
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ALERT *  
FitzPatrick 100        
Ginna 99   COASTDOWN TO REFUELING OUTAGE *  
Hope Creek 1 100   HIGH SYSTEM VOLTAGE ACTION    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 84   REDUCED POWER - 2 CIRC WATER PUMPS OUT OF SERVICE DUE TO ELECTRICAL FAULT *  
Millstone 2 0 10/03/2015 REFUELING OUTAGE *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100     *  
Peach Bottom 2 100   MAINTAIN < 100 MVARS ON UNIT 2 HIGH SYSTEM VOLTAGE ACTION *  
Peach Bottom 3 0 09/20/2015 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  
Pilgrim 1 100     *  
Salem 1 100        
Salem 2 100        
Seabrook 1 0 09/30/2015 REFUELING OUTAGE    
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION    
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION    
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 99   MAXIMUM POWER IN CURRENT ROD PATTERN *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/12/2015 START-UP IN PROGRESS *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 09/07/2015 REFUELING OUTAGE *  
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 10/02/2015 REFUELING OUTAGE    
Surry 1 100        
Surry 2 97   COASTDOWN TO REFUELING OUTAGE *  
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 0 09/20/2015 REFUELING OUTAGE    
Vogtle 2 100        
Watts Bar 1 0 09/20/2015 REFUELING OUTAGE    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 0 10/04/2015 REFUELING OUTAGE    
Byron 1 100        
Byron 2 90   REDUCED POWER DUE TO DISPATCH ORDER *  
Clinton 99   100% ELECTRICAL GENERATION    
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION *  
D.C. Cook 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Davis-Besse 100   HIGH SYSTEM VOLTAGE ACTION    
Dresden 2 97   COASTDOWN TO REFUELING OUTAGE    
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 09/13/2015 REFUELING OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 0 09/16/2015 REFUELING OUTAGE *  
Perry 1 100        
Point Beach 1 100   SWITCHYARD MAINTENANCE IN PROGRESS - MAINTAIN MINIMUM 72 MVAR OUT    
Point Beach 2 0 10/02/2015 REFUELING OUTAGE    
Prairie Island 1 70   INCREASING POWER AFTER TURBINE VALVE TESTING *  
Prairie Island 2 100     *  
Quad Cities 1 100     *  
Quad Cities 2 100     *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 09/20/2015 REFUELING OUTAGE    
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 0 10/03/2015 REFUELING OUTAGE    
Cooper 100        
Diablo Canyon 1 0 10/03/2015 REFUELING OUTAGE    
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 92   INCREASING POWER AFTER ROD SEQUENCE EXCHANGE *  
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        