Power Reactor Status Report for May 30, 2015

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 65   REDUCED POWER FOR PLANNED MAINTENANCE *  
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 40   REDUCED POWER FOR PLANNED MAINTENANCE *  
Peach Bottom 2 100        
Peach Bottom 3 58   REDUCED POWER FOR PLANNED MAINTENANCE *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 85   HOLDING FOR FUEL SOAK *  
Three Mile Island 1 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 70   REDUCED POWER FOR PLANNED MAINTENANCE *  
Brunswick 1 65   REDUCED POWER FOR PLANNED MAINTENANCE *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 0 05/26/2015 MAINTENANCE OUTAGE - SHUTDOWN TO REPLACE PRIMARY RELIEF VALVE *  
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 05/11/2015 REFUELING OUTAGE    
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 63   HOLDING POWER FOR MAINTENANCE *  
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 62   INCREASING POWER *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 99   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 99   MAX RECIRC FLOW    
Fermi 2 100        
La Salle 1 100        
La Salle 2 70   REDUCED POWER FOR ROD PATTERN ADJUSTMENT AND TURBINE VALVE TESTING *  
Monticello 11   INCREASING POWER *  
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 0 05/09/2015 REFUELING OUTAGE.    
Comanche Peak 1 85   REDUCED POWER FOR PLANNED TURBINE VALVE TESTING *  
Comanche Peak 2 100        
Cooper 0 05/29/2015 MAINTENANCE OUTAGE *  
Diablo Canyon 1 100   DE-ENERGIZING SITE 230KV LINE ON 5/30 FOR 20 HOURS FOR SWITCHYARD MAINTENANCE *  
Diablo Canyon 2 100   DE-ENERGIZING SITE 230KV LINE ON 5/30 FOR 20 HOURS FOR SWITCHYARD MAINTENANCE *  
Fort Calhoun 0 04/11/2015 REFUELING OUTAGE - STARTUP IN PROGRESS *  
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 52   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
South Texas 1 100        
South Texas 2 100     *  
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.