Power Reactor Status Report for April 19, 2015

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 48   HOLDING POWER UNTIL REFUELING OUTAGE ON 4/25    
Beaver Valley 2 100        
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT    
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 04/10/2015 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 0 04/12/2015 REFUELING OUTAGE    
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 96   HOLDING POWER FOR EPU TESTING    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100     *  
Susquehanna 2 0 04/10/2015 REFUELING OUTAGE *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 0 03/29/2015 REFUELING OUTAGE    
Farley 2 100        
Harris 1 0 04/01/2015 REFUELING OUTAGE    
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 0 03/22/2015 REFUELING OUTAGE *  
Saint Lucie 2 0 04/11/2015 STARTUP IN PROGRESS *  
Sequoyah 1 0 04/11/2015 REFUELING OUTAGE - FUEL MOVEMENT IN PROGRESS    
Sequoyah 2 100        
Summer 100        
Surry 1 0 04/18/2015 REFUELING OUTAGE *  
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 55   INCREASING POWER *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 94   COASTDOWN TO REFUELING OUTAGE 100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION *  
D.C. Cook 2 0 03/25/2015 REFUELING OUTAGE - COMMENCED RCS HEATUP HIGH SYSTEM VOLTAGE ACTION *  
Davis-Besse 100   HIGH SYSTEM VOLTAGE ACTION    
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
La Salle 1 100        
La Salle 2 100        
Monticello 0 04/12/2015 REFUELING OUTAGE    
Palisades 100        
Perry 1 0 03/08/2015 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 04/07/2015 FORCED OUTAGE TO REPLACE REACTOR COOLANT PUMP SEAL    
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 98   COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/11/2015 REFUELING OUTAGE    
Grand Gulf 1 100     *  
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 04/03/2015 REFUELING OUTAGE    
River Bend 1 100        
South Texas 1 100        
South Texas 2 0 03/28/2015 REFUELING OUTAGE *  
Waterford 3 72   REDUCED POWER DUE TO FEEDWATER HEATER ISOLATION    
Wolf Creek 1 0 02/28/2015 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021