The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 14, 2015

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 98   COASTDOWN TO REFUELING OUTAGE    
Beaver Valley 2 100     *  
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION    
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 04/10/2015 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 0 04/12/2015 REFUELING OUTAGE *  
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 98   INCREASING POWER *  
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 96   HOLDING POWER FOR EPU TESTING    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION    
Susquehanna 2 0 04/10/2015 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION    
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 90   INCREASING POWER    
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 0 03/29/2015 REFUELING OUTAGE    
Farley 2 100        
Harris 1 0 04/01/2015 REFUELING OUTAGE    
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 85   REDUCED POWER DUE TO HEATER DRAIN PUMP TRIP *  
Saint Lucie 1 0 03/22/2015 REFUELING OUTAGE    
Saint Lucie 2 0 04/11/2015 FORCED OUTAGE TS REQ'D S/D SEE EN 50977    
Sequoyah 1 0 04/11/2015 REFUELING OUTAGE    
Sequoyah 2 100        
Summer 100        
Surry 1 89   COASTDOWN TO REFUELING OUTAGE *  
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 03/29/2015 REFUELING OUTAGE *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   COASTDOWN TO REFUELING OUTAGE 100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION    
D.C. Cook 2 0 03/25/2015 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION    
Davis-Besse 100   HIGH SYSTEM VOLTAGE ACTION    
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
La Salle 1 100        
La Salle 2 100        
Monticello 0 04/12/2015 REFUELING OUTAGE    
Palisades 100        
Perry 1 0 03/08/2015 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION    
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 04/07/2015 FORCED OUTAGE TO REPLACE REACTOR COOLANT PUMP SEAL    
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/11/2015 REFUELING OUTAGE    
Grand Gulf 1 96   PERFORMING XENON SOAK THEN INCREASING POWER AFTER COMPLETING ROD PATTERN ADJUSTMENT *  
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 04/03/2015 REFUELING OUTAGE    
River Bend 1 100        
South Texas 1 100        
South Texas 2 0 03/28/2015 REFUELING OUTAGE    
Waterford 3 100        
Wolf Creek 1 0 02/28/2015 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021