Power Reactor Status Report for April 28, 2014
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 0 | 04/18/2014 | REFUELING OUTAGE | ||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 0 | 04/27/2014 | ENTERING REFUELING OUTAGE | * | |
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 0 | 04/24/2014 | MAINTENANCE OUTAGE - TURBINE BLADE REPLACEMENT | ||
| Millstone 2 | 0 | 04/05/2014 | DEFUELED | ||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | * | |||
| Nine Mile Point 2 | 1 | REACTOR IS CRITICAL AT 0 PERCENT POWER | * | ||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 0 | 04/12/2014 | REFUELING OUTAGE | * | |
| Seabrook 1 | 100 | SINGLE DOWNPOWER CONTINGENCY IN EFFECT DUE TO PLANNED LINE MAINTENANCE | * | ||
| Susquehanna 1 | 0 | 04/12/2014 | REFUELING OUTAGE | ||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 93 | INCREASING POWER TO 100% | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | * | |||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 0 | 04/14/2014 | DEFUELED | ||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 84 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Summer | 0 | 04/04/2014 | DEFUELED | ||
| Surry 1 | 100 | ||||
| Surry 2 | 0 | 04/20/2014 | REFUELING OUTAGE | * | |
| Turkey Point 3 | 48 | HOLDING POWER FOR NI GAIN ADJUST PRIOR TO FLUX MAPPING | * | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | * | |||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 0 | 03/23/2014 | REFUELING OUTAGE |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 98 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| D.C. Cook 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| Davis-Besse | 0 | 01/31/2014 | REFUELING OUTAGE | ||
| Dresden 2 | 17 | PREPARING TO SYNC TO THE GRID | * | ||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 93 | HOLDING POWER FOR PLANT TESTING | |||
| La Salle 1 | 100 | ||||
| La Salle 2 | 0 | 04/27/2014 | MAINTENANCE OUTAGE | * | |
| Monticello | 88 | ENGINEERING HOLD FOR EPU TESTING | |||
| Palisades | 100 | ||||
| Perry 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| Point Beach 1 | 56 | REDUCING POWER FOR PLANNED MAINTENANCE OUTAGE - CONTAINMENT DOME TRUSS REPAIRS | * | ||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 54 | INCREASING POWER TO 70% AND HOLDING PER ACTIVITY PLAN | * | ||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 0 | 03/31/2014 | REFUELING OUTAGE |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 20 | REDUCED POWER AND HOLDING DUE TO GRID DISTURBANCE AND SEVERE THUNDERSTORMS | * | ||
| Arkansas Nuclear 2 | 0 | 04/27/2014 | AUTOMATIC REACTOR TRIP DUE TO AUXILIARY TRIP ON CORE PROTECTION CALCULATOR - SEE EN #50063 - WILL EVALUATE IN THE MORNING WHETHER TO RESTART OR ENTER RFO. | * | 1 |
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 45 | HOLDING POWER FOR TESTING | * | ||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 51 | REDUCED POWER AND HOLDING FOR HEATER DRAIN PUMP MAINTENANCE | * | ||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 0 | 04/04/2014 | REFUELING OUTAGE | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| South Texas 1 | 0 | 03/15/2014 | REFUELING OUTAGE | ||
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 04/12/2014 | DEFUELED | ||
| Wolf Creek 1 | 0 | 03/07/2014 | MAINTENANCE OUTAGE | * |