Power Reactor Status Report for April 16, 2014
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 82 | COASTDOWN TO REFUELING OUTAGE | |||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 0 | 04/05/2014 | REFUELING OUTAGE | ||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 0 | 03/23/2014 | REFUELING OUTAGE | ||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | GRID IS YELLOW DUE TO #3 EMERGENCY XFMR OUT OF SERVICE FOR PLANNED MAINTENANCE | * | ||
| Peach Bottom 3 | 100 | GRID IS YELLOW DUE TO #3 EMERGENCY XFMR OUT OF SERVICE FOR PLANNED MAINTENANCE | * | ||
| Pilgrim 1 | 100 | ONE 345kV LINE 355 OUT OF SERVICE FOR PLANNED MAINTENANCE | |||
| Salem 1 | 0 | 04/12/2014 | AUTOMATIC REACTOR TRIP. SEE EN #50032. | ||
| Salem 2 | 0 | 04/12/2014 | REFUELING OUTAGE | * | |
| Seabrook 1 | 0 | 03/31/2014 | REFUELING OUTAGE - CORE RELOADED | ||
| Susquehanna 1 | 0 | 04/12/2014 | REFUELING OUTAGE | * | |
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 94 | INCREASING POWER | * | ||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 0 | 03/21/2014 | REFUELING OUTAGE | * | |
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 0 | 04/14/2014 | REFUELING OUTAGE | * | |
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 0 | 03/02/2014 | EXITING REFUELING OUTAGE | ||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 97 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Summer | 0 | 04/04/2014 | REFUELING OUTAGE | ||
| Surry 1 | 100 | ||||
| Surry 2 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Turkey Point 3 | 0 | 03/16/2014 | REFUELING OUTAGE | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 25 | HOLDING POWER. TURBINE IS OFFLINE FOR INVESTIGATION OF VIBRATION ISSUES. | * | ||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 0 | 03/23/2014 | REFUELING OUTAGE |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 01/31/2014 | REFUELING OUTAGE | ||
| Dresden 2 | 0 | 04/11/2014 | FORCED OUTAGE - MAIN TRANSFORMER REPLACEMENT IN PROGRESS | * | |
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 0 | 04/15/2014 | MAINTENANCE OUTAGE - RCS COOLDOWN IN PROGRESS - PLANNED OUTAGE FOR "2B" TRANSFORMER REPAIRS | * | |
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 88 | ENGINEERING HOLD FOR EPU TESTING | |||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 0 | 03/16/2014 | REFUELING OUTAGE | ||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 0 | 03/31/2014 | REFUELING OUTAGE |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 0 | 03/29/2014 | REFUELING OUTAGE | ||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 57 | INCREASING POWER TO 100% - ENTERED/EXITED TS REQUIRED SHUTDOWN DUE TO FAILURE OF CR AIR CONDITIONING - SEE EN #50038 | * | ||
| Grand Gulf 1 | 96 | INCREASING POWER TO 100% | * | ||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 0 | 04/04/2014 | REFUELING OUTAGE | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| South Texas 1 | 0 | 03/15/2014 | REFUELING OUTAGE | ||
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 04/12/2014 | REFUELING OUTAGE | ||
| Wolf Creek 1 | 0 | 03/07/2014 | MID CYCLE PLANNED MAINTENANCE OUTAGE |