Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for March 18, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 0 03/16/2014 REFUELING OUTAGE    
Calvert Cliffs 2 100        
FitzPatrick 50   REDUCED POWER FOR CONDENSER TUBE LEAK REPAIR *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 0 02/23/2014 REFUELING OUTAGE *  
Indian Point 3 100     *  
Limerick 1 0 03/04/2014 REFUELING OUTAGE    
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100   JUMPERS INSTALLED AROUND MAIN GENERATOR DISCONNECT    
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 99   100% ELECTRICAL CAPABILITY    
Susquehanna 2 24   INCREASING POWER - GENERATOR ONLINE *  
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 17   PREPARING TO SYNCHRONIZE TO GRID *  
Brunswick 1 0 02/28/2014 REFUELING OUTAGE    
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 03/07/2014 FORCED OUTAGE - SHUTDOWN FOR SG TUBE REPAIRS - CORE OFFLOAD IN PROGRESS    
Saint Lucie 1 100        
Saint Lucie 2 0 03/02/2014 DEFUELED    
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 0 03/16/2014 REFUELING OUTAGE *  
Turkey Point 4 100        
Vogtle 1 0 03/16/2014 REFUELING OUTAGE    
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 03/09/2014 DEFUELED    
Byron 2 100        
Clinton 86   GENERATOR DISPATCH REQUEST    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 01/31/2014 REFUELING OUTAGE    
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 02/10/2014 REFUELING OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 93   ENGINEERING HOLD FOR EPU TESTING    
Palisades 94   HOLDING POWER FOR ENGINEERING WORK *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 0 03/16/2014 REFUELING OUTAGE *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 91   COASTDOWN TO REFUELING OUTAGE    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 0 03/16/2014 FORCED OUTAGE - THIRD RCP #1 SEAL REPAIR IN PROGRESS - ESTIMATED DURATION 7-10 DAYS *  
Diablo Canyon 2 100        
Fort Calhoun 0 03/17/2014 FORCED OUTAGE - AUTOMATIC RX TRIP ON TURBINE TRIP DUE TO LOSS OF STATOR COOLING WATER - SEE EN #49926 - ANTICIPATE RESTART IN APPROXIMATELY 24 HOURS * 1
Grand Gulf 1 0 03/17/2014 FORCED OUTAGE - MANUAL RX SCRAM DUE TO STEAM LEAK IN LOW PRESSURE TURBINE LINE - SEE EN #49920 - REPAIR IN PROGRESS * 1
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 0 03/15/2014 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 03/07/2014 MID CYCLE PLANNED MAINTENANCE OUTAGE    