The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 2, 2013

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 09/29/2013 REFUELING OUTAGE    
Beaver Valley 2 100        
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ALERT    
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ALERT    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100   13.8 KV LINE 33332LM OOS SOLAR MAGNETIC STORM IN AREA *  
Indian Point 3 100   13.8 KV LINE 33332LM OOS SOLAR MAGNETIC STORM IN AREA *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 09/30/2013 MAINTENANCE OUTAGE    
Peach Bottom 2 100        
Peach Bottom 3 0 09/08/2013 DEFUELED    
Pilgrim 1 100   345 KV OFFSITE LINE WORK SOLAR MAGNETIC STORM IN AREA *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    
Vermont Yankee 100   SOLAR MAGNETIC STORM WARNING *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 0 09/13/2013 DEFUELED    
Farley 1 0 09/29/2013 REFUELING OUTAGE    
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 09/07/2013 REFUELING OUTAGE *  
North Anna 2 100        
Oconee 1 100        
Oconee 2 100   COASTDOWN TO REFUELING OUTAGE *  
Oconee 3 100        
Robinson 2 0 09/13/2013 REFUELING OUTAGE - DEFUELED *  
Saint Lucie 1 0 09/30/2013 REFUELING OUTAGE    
Saint Lucie 2 100        
Sequoyah 1 82   COASTDOWN TO REFUELING OUTAGE PLANNED MAINTENANCE ON ONE 500 KV LINE *  
Sequoyah 2 100   PLANNED MAINTENANCE ON ONE 500 KV LINE *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 85   INCREASING POWER *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   COASTDOWN TO REFUELING OUTAGE    
D.C. Cook 1 100     *  
D.C. Cook 2 0 10/01/2013 REFUELING OUTAGE *  
Davis-Besse 100     *  
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 91   INCREASING POWER AFTER ROD PATTERN ADJUSTMENT *  
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100     *  
Point Beach 1 100   SOLAR MAGNETIC DISTURBANCE K-6 WARNING *  
Point Beach 2 100   SOLAR MAGNETIC DISTURBANCE K-6 WARNING *  
Prairie Island 1 100        
Prairie Island 2 0 09/21/2013 DEFUELED    
Quad Cities 1 100        
Quad Cities 2 100     *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 83   HEATER DRAIN PUMP MAINTENANCE    
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE - FUEL LOADING COMPLETE    
Grand Gulf 1 100     *  
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 0 10/01/2013 MAINTENANCE OUTAGE *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100     *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021