The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for September 30, 2013

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 09/29/2013 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ALERT *  
Beaver Valley 2 100   HIGH SYSTEM VOLTAGE ALERT *  
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ALERT *  
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ALERT *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100     *  
Indian Point 2 100   13.8 KV LINE 33332LM OOS    
Indian Point 3 100   13.8 KV LINE 33332LM OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 53   REDUCING POWER TO 25% FOR TURBINE CONTROL TESTING *  
Peach Bottom 2 100        
Peach Bottom 3 0 09/08/2013 DEFUELED    
Pilgrim 1 100   345 KV OFFSITE LINE WORK    
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ALERT *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ALERT *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Vermont Yankee 99        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 0 09/13/2013 DEFUELED    
Farley 1 0 09/29/2013 REFUELING OUTAGE *  
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 09/07/2013 REFUELING OUTAGE - CORE RELOADED    
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 09/13/2013 REFUELING OUTAGE    
Saint Lucie 1 0 09/30/2013 REFUELING OUTAGE *  
Saint Lucie 2 100        
Sequoyah 1 83   COASTDOWN TO REFUELING OUTAGE GRID RISK IS QUALIFIED - PLANNED MAINTENANCE ON ONE 500 KV LINE *  
Sequoyah 2 100   GRID RISK IS QUALIFIED - PLANNED MAINTENANCE ON ONE 500 KV LINE *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 09/08/2013 REFUELING OUTAGE *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   COASTDOWN TO REFUELING OUTAGE *  
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION    
D.C. Cook 2 52   SHUTTTING DOWN TO ENTER REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  
Davis-Besse 100   HIGH SYSTEM VOLTAGE ALERT    
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 90   INCREASING POWER *  
La Salle 1 100        
La Salle 2 73   INCREASING POWER TO 100% *  
Monticello 100        
Palisades 100        
Perry 1 100   HIGH VOLTAGE ACTION    
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 09/21/2013 DEFUELED    
Quad Cities 1 100     *  
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 83   HEATER DRAIN PUMP MAINTENANCE *  
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE - FUEL LOADING COMPLETE    
Grand Gulf 1 100     *  
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 87   FEEDWATER HEATER/CONDENSER BELLOWS ISSUE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 7   INCREASING POWER *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021