Power Reactor Status Report for March 22, 2013
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 0 | 02/17/2013 | EXIT REFUELING OUTAGE | * | |
FitzPatrick | 96 | INCREASING POWER | * | ||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | 13.8 KV LINE 33332LM OOS | |||
Indian Point 3 | 0 | 03/03/2013 | 13.8 KV LINE 33332LM OOS REFUELING OUTAGE - CORE RELOAD COMPLETE | ||
Limerick 1 | 100 | ||||
Limerick 2 | 98 | COASTDOWN TO REFUELING OUTAGE | |||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 94 | POWER LIMITED TO MONITOR AN SRV TAILPIPE TEMPERATURE | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 99 | LIMITED BY GENERATOR CAPABILITY CURVE - VOLTAGE REGULATOR IN MANUAL - OUTPUT LIMITED TO 1340 MWE BY GRID OPERATOR | |||
Susquehanna 2 | 99 | LIMITED BY GENERATOR CAPABILITY CURVE - OUTPUT LIMITED TO 1340 MWE BY GRID OPERATOR | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 0 | 03/09/2013 | REFUELING OUTAGE |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/19/2013 | MANUAL REACTOR SCRAM AFTER LOSS OF VACUUM - SEE EN #48829 | ||
Browns Ferry 2 | 0 | 03/14/2013 | REFUELING OUTAGE | ||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 0 | 03/02/2013 | REFUELING OUTAGE | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 02/03/2013 | DEFUELED | ||
Farley 1 | 100 | ||||
Farley 2 | 87 | COASTDOWN TO REFUELING OUTAGE | * | ||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 79 | INCREASING POWER | * | ||
McGuire 1 | 0 | 03/16/2013 | REFUELING OUTAGE | ||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 0 | 03/12/2013 | FORCED OUTAGE | ||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 95 | REDUCED POWER DUE TO EXCESSIVE HIGH STEAM FLOW ALARMS | |||
Turkey Point 4 | 0 | 11/04/2012 | REFUELING OUTAGE | ||
Vogtle 1 | 100 | ||||
Vogtle 2 | 0 | 03/10/2013 | REFUELING OUTAGE | ||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 4 | INCREASING POWER | * | ||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 66 | MAIN FEEDPUMP REPAIRS IN PROGRESS | |||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 0 | 03/01/2013 | REFUELING OUTAGE | ||
Palisades | 100 | ||||
Perry 1 | 0 | 03/17/2013 | REFUELING OUTAGE | * | |
Point Beach 1 | 0 | 03/17/2013 | REFUELING OUTAGE | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 0 | 03/10/2013 | REFUELING OUTAGE | ||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 80 | COASTDOWN TO REFUELING OUTAGE | |||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 97 | COASTDOWN TO REFUELING OUTAGE | |||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 0 | 02/02/2013 | LOW POWER PHYSICS TESTING | * | |
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 70 | INCREASING POWER | * | ||
San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR | ||
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 01/08/2013 | FORCED OUTAGE | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 0 | 02/03/2013 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS |