Power Reactor Status Report for November 2, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 15 | HOLDING POWER FOR TURBINE TESTING - GENERATOR OFFLINE | * | ||
| Calvert Cliffs 1 | 100 | HIGH SYSTEM VOLTAGE ALERT IN EFFECT | |||
| Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE ALERT IN EFFECT | |||
| FitzPatrick | 100 | ||||
| Ginna | 0 | 10/21/2012 | REFUELING OUTAGE | ||
| Hope Creek 1 | 100 | HIGH SYSTEM VOLTAGE ACTION IN EFFECT | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 30 | INCREASING POWER - W98 OUTPUT FEEDER REPAIRS IN PROGRESS | * | ||
| Limerick 1 | 100 | HIGH SYSTEM VOLTAGE WARNING IN EFFECT | * | ||
| Limerick 2 | 100 | HIGH SYSTEM VOLTAGE WARNING IN EFFECT | * | ||
| Millstone 2 | 0 | 10/06/2012 | DEFUELED | ||
| Millstone 3 | 100 | * | |||
| Nine Mile Point 1 | 1 | STARTUP IN PROGRESS - REACTOR CRITICAL AT 0% POWER | * | ||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 0 | 10/21/2012 | REFUELING OUTAGE | ||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 1 | HOLDING POWER FOR SECONDARY PLANT STARTUP | * | ||
| Salem 2 | 0 | 10/14/2012 | DEFUELED | ||
| Seabrook 1 | 91 | INCREASING POWER TO 100% - MOCC2 IN EFFECT (DO NOT PERFORM SURVEILLANCES THAT PUT GENERATION AT RISK) | * | ||
| Susquehanna 1 | 0 | 10/20/2012 | TURBINE BLADE INSPECTION - HIGH SYSTEM VOLTAGE ACTION | * | |
| Susquehanna 2 | 71 | HOLDING POWER DUE TO LINE CONFIGURATION LIMIT- HIGH SYSTEM VOLTAGE ACTION | * | ||
| Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Vermont Yankee | 100 | MLCC2 IN EFFECT (DO NOT PERFORM SURVEILLANCES THAT PUT GENERATION AT RISK) | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 10/19/2012 | REFUELING OUTAGE | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONT.TENSIONING ON HOLD | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 0 | 09/15/2012 | REFUELING OUTAGE | ||
| North Anna 1 | 100 | ||||
| North Anna 2 | 99 | * | |||
| Oconee 1 | 0 | 10/26/2012 | REFUELING OUTAGE | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 0 | 08/05/2012 | REFUELING OUTAGE, 240 PSI IN RCS | * | |
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 0 | 10/14/2012 | DEFUELED | ||
| Summer | 0 | 10/12/2012 | DEFUELED | ||
| Surry 1 | 100 | ||||
| Surry 2 | 0 | 10/31/2012 | REFUELING OUTAGE | * | |
| Turkey Point 3 | 92 | HOLDING POWER FOR EPU TESTING | * | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 90 | INCREASING POWER TO 91.5% POWER FOR HOLD | * |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 0 | 10/15/2012 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 56 | FEED PUMP DAMAGE | * | ||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 87 | COASTDOWN TO REFUELING OUTAGE | |||
| Duane Arnold | 0 | 10/05/2012 | REFUELING OUTAGE | ||
| Fermi 2 | 68 | POWER LIMITED TO 68% DUE TO SOUTH REACTOR FEED PUMP OOS | |||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | * | |||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 0 | 10/31/2012 | REFUELING OUTAGE | * | |
| Prairie Island 1 | 0 | 10/22/2012 | REFUELING OUTAGE | * | |
| Prairie Island 2 | 100 | * | |||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 0 | 11/01/2012 | MANUALLY TRIPPED DUE TO HIGH RCP MOTOR BEARING TEMP - SEE EN#48475 | * | 1 |
| Comanche Peak 2 | 3 | PLANT STARTUP - INCREASING POWER | * | ||
| Cooper | 0 | 10/13/2012 | REFUELING OUTAGE | ||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 04/09/2011 | DEFUELED | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | * | |||
| Palo Verde 2 | 0 | 10/05/2012 | HEATUP IN PROGRESS | * | |
| Palo Verde 3 | 40 | INCREASING POWER | * | ||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
| San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR - DEFUELED | ||
| South Texas 1 | 0 | 10/20/2012 | DEFUELED | * | |
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 10/17/2012 | DEFUELED | ||
| Wolf Creek 1 | 100 |