The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 11, 2012

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 09/23/2012 DEFUELED    
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ALERT *  
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ALERT *  
FitzPatrick 0 09/16/2012 REFUELING OUTAGE *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100   138 KV FEEDER RESTRICTIONS    
Indian Point 3 100   138 kV FEEDER RESTRICTIONS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 10/06/2012 REFUELING OUTAGE    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 0 09/09/2012 LOADING FUEL INTO CORE    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 0 09/14/2012 REFUELING OUTAGE    
Susquehanna 1 75   TURBINE BLADE ISSUES HIGH SYSTEM VOLTAGE ACTION    
Susquehanna 2 75   TURBINE BLADE ISSUES HIGH SYSTEM VOLTAGE ACTION    
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    
Vermont Yankee 94   REDUCED POWER FOR ON-GOING LINE WORK    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100     *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED - CONT.TENSIONING ON HOLD    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/15/2012 DEFUELED    
North Anna 1 100        
North Anna 2 0 10/08/2012 MAINTENANCE OUTAGE- RCP SEAL REPAIR    
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 08/05/2012 REFUELING OUTAGE LOADING FUEL INTO CORE *  
Sequoyah 1 100        
Sequoyah 2 100        
Summer 84   COASTDOWN TO REFUELING *  
Surry 1 100        
Surry 2 100        
Turkey Point 3 31   SLOWLY RAISING POWER FOR SECONDARY CHEMISTRY *  
Turkey Point 4 100        
Vogtle 1 0 09/16/2012 MAINTENANCE OUTAGE REPAIRING MSIV *  
Vogtle 2 100        
Watts Bar 1 0 09/10/2012 REFUELING OUTAGE    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 96   DOWN POWER TO 90% FOR SURVEILLANCE TESTING *  
Byron 1 90   INCREASING POWER *  
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100   HIGH VOLTAGE ACTION    
D.C. Cook 2 100   HIGH VOLTAGE ACTION    
Davis-Besse 100   HIGH VOLTAGE ACTION    
Dresden 2 100        
Dresden 3 94   COASTDOWN TO REFUELING OUTAGE    
Duane Arnold 0 10/05/2012 REFUELING OUTAGE    
Fermi 2 68   POWER LIMITED TO 68% DUE TO SOUTH REACTOR FEED PUMP OOS    
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 55   INCREASING POWER *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 0 10/06/2012 REFUELING OUTAGE    
Cooper 92   COASTDOWN TO REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 10/05/2012 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 0 01/09/2012 REFUELING OUTAGE    
San Onofre 3 0 01/31/2012 DEFUELED, FORCED OUTAGE - S/G REPAIR    
South Texas 1 100   COASTDOWN TO REFUELING OUTAGE *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021