The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 6, 2012

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 09/23/2012 REFUELING OUTAGE - RV HEAD REMOVED    
Calvert Cliffs 1 98   WATERBOX MAINTENANCE *  
Calvert Cliffs 2 100     *  
FitzPatrick 0 09/16/2012 REFUELING OUTAGE RV REASSEMBLY ONGOING    
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100   138 KV FEEDER RESTRICTIONS    
Indian Point 3 100   138 kV FEEDER RESTRICTIONS 13.8 kV FEEDER RESTRICTIONS FEEDER 33332 L AND M OOS    
Limerick 1 100        
Limerick 2 65   WATER BOX CLEANING - ROD PATTERN ADJUSTMENT *  
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100     *  
Peach Bottom 2 0 09/09/2012 DEFUELED    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 0 09/14/2012 REFUELING OUTAGE - 345KV LINE #3135 OOS MAKING THE NEWINGTON LINE UNAVAILABLE    
Susquehanna 1 85   TURBINE BLADE ISSUES *  
Susquehanna 2 85   TURBINE BLADE ISSUES *  
Three Mile Island 1 100     *  
Vermont Yankee 95   REDUCED POWER FOR ON-GOING LINE WORK    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED - CONTAINMENT TENSIONING ON HOLD    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 86   ROD PATTERN ADJUSTMENT *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/15/2012 DEFUELED    
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 08/05/2012 DEFUELED    
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 88   WATERBOX MAINTENANCE    
Turkey Point 3 29   30% PWR HOLD FOR SECONDARY CHEMISTRY *  
Turkey Point 4 100        
Vogtle 1 0 09/16/2012 REFUELING OUTAGE    
Vogtle 2 100        
Watts Bar 1 0 09/10/2012 BEGIN CORE RELOAD    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 09/10/2012 REFUELING OUTAGE *  
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100     *  
Dresden 2 100        
Dresden 3 96   COASTDOWN TO REFUELING OUTAGE *  
Duane Arnold 0 10/05/2012 REFUELING OUTAGE *  
Fermi 2 68   POWER LIMITED TO 68% DUE TO SOUTH REACTOR FEED PUMP OOS    
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 09/13/2012 REFUELING OUTAGE    
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 93   COASTDOWN TO REFUELING OUTAGE *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 10/05/2012 REFUELING OUTAGE *  
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 0 01/09/2012 REFUELING OUTAGE    
San Onofre 3 0 01/31/2012 FORCED OUTAGE - S/G REPAIR - DEFUELING IN PROGRESS    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021