The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 6, 2012

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 04/08/2012 EXITING REFUELING OUTAGE    
Beaver Valley 2 100        
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ALERT    
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ALERT    
FitzPatrick 100   MAY BE REQUESTED TO LOWER POWER FOR HIGH GRID VOLTAGE    
Ginna 100        
Hope Creek 1 0 04/13/2012 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 0 04/08/2012 REFUELING OUTAGE    
Oyster Creek 100        
Peach Bottom 2 78   ROD PATTERN ADJUSTMENT PLANNED LOAD DROP FOR WATERBOX INSPECTION AND FAILED TURBINE CONTROL VALVE INVESTIGATION *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 0 04/30/2012 PREPARATIONS TO CONTINUE HEAT UP *  
Salem 2 100        
Seabrook 1 85   POWER LIMITED TO 85% BASED ON GENERATOR STATOR COOLING DELTA T LIMIT    
Susquehanna 1 0 03/31/2012 REFUELING OUTAGE HIGH VOLTAGE SYSTEM ACTION    
Susquehanna 2 100   HIGH VOLTAGE SYSTEM ACTION    
Three Mile Island 1 100   HIGH VOLTAGE SYSTEM ACTION    
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 0 04/07/2012 REFUELING OUTAGE    
Brunswick 1 97   ROD PATTERN ADJUSTMENT *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED - CONTAINMENT TENSIONING ON HOLD *  
Farley 1 100        
Farley 2 100        
Harris 1 0 04/20/2012 DEFUELED    
Hatch 1 100        
Hatch 2 0 05/04/2012 FORCED OUTAGE    
McGuire 1 100        
McGuire 2 100        
North Anna 1 98   INCREASING POWER *  
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 04/13/2012 DEFUELED    
Robinson 2 100        
Saint Lucie 1 30   SECONDARY CHEMISTRY HOLD *  
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100     *  
Summer 100        
Surry 1 0 05/05/2012 REFUELING OUTAGE *  
Surry 2 100        
Turkey Point 3 0 02/26/2012 DEFUELED    
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 04/15/2012 DEFUELED    
Braidwood 2 100        
Byron 1 99   SLIGHTLY REDUCED POWER FOR FEED FLOW INSTRUMENTATION INVESTIGATION    
Byron 2 100   SLIGHTLY REDUCED POWER FOR FEED FLOW INSTRUMENTATION INVESTIGATION    
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION    
D.C. Cook 2 100   HIGH SYSTEM VOLTAGE ACTION    
Davis-Besse 0 05/05/2012 REFUELING OUTAGE *  
Dresden 2 100        
Dresden 3 100        
Duane Arnold 99   CONTROL ROD SEQUENCE EXCHANGE *  
Fermi 2 24   HOLDING POWER FOR BALANCE OF PLANT LEAK REPAIR *  
Kewaunee 0 04/05/2012 REFUELING OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 0 04/08/2012 REFUELING OUTAGE    
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 02/21/2012 REFUELING OUTAGE    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 85   LOAD FOLLOWING EXCESS HYDRO POWER *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 0 04/22/2012 DEFUELED - CORE OFFLOADED    
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE    
Grand Gulf 1 0 02/19/2012 REFUELING OUTAGE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 0 05/03/2012 SHUTDOWN FOR #3 TURBINE CONTROL VALVE CLOSURE REPAIR    
San Onofre 2 0 01/09/2012 REFUELING OUTAGE    
San Onofre 3 0 01/31/2012 FORCED OUTAGE - S/G REPAIR    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021