Power Reactor Status Report for April 2, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 96 | COASTDOWN TO REFUELING OUTAGE | |||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 0 | 02/05/2012 | REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION | ||
Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
FitzPatrick | 15 | REDUCED POWER TO INVESTIGATE LOW LUBE ALARM ON RECIRC PUMP - WILL INCREASE POWER AFTER INERTING IS COMPLETED - GENERATOR ONLINE | * | ||
Ginna | 100 | ||||
Hope Creek 1 | 99 | COASTDOWN TO REFUELING OUTAGE - HIGH SYSTEM VOLTAGE ACTION | |||
Indian Point 2 | 30 | HOLDING POWER FOR SECONDARY CHEMISTRY | * | ||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | #2 STARTUP SOURCE OUTAGE FOR PLANNED MAINTENANCE | * | ||
Peach Bottom 3 | 100 | #2 STARTUP SOURCE OUTAGE FOR PLANNED MAINTENANCE | * | ||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 85 | HOLDING POWER BASED ON GENERATOR STATOR COOLING DELTA T LIMIT. | |||
Susquehanna 1 | 0 | 03/31/2012 | REFUELING OUTAGE - HIGH SYSTEM VOLTAGE ACTION | ||
Susquehanna 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
Brunswick 1 | 0 | 02/23/2012 | REFUELING OUTAGE | ||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 0 | 03/10/2012 | FUEL LOADED | ||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONTAINMENT TENSIONING ON HOLD | ||
Farley 1 | 0 | 04/01/2012 | REFUELING OUTAGE | * | |
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | * | |||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 0 | 03/10/2012 | REFUELING OUTAGE | ||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 89 | COASTDOWN TO REFUELING OUTAGE | * | ||
Robinson 2 | 97 | INCREASING POWER TO 100% | * | ||
Saint Lucie 1 | 0 | 03/30/2012 | EXITING REFUELING OUTAGE | * | |
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 40 | INCREASING POWER TO 100% | * | ||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 0 | 02/26/2012 | DEFUELED | ||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | FEED WATER FLOW INVESTIGATION | |||
Byron 2 | 100 | FEED WATER FLOW INVESTIGATION | |||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | * | |||
D.C. Cook 2 | 0 | 03/21/2012 | DEFUELED | * | |
Davis-Besse | 100 | * | |||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 0 | 03/25/2012 | REFUELING OUTAGE | ||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 60 | COOLING TOWER REPLACEMENT | |||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 0 | 02/21/2012 | DEFUELED | ||
Quad Cities 1 | 100 | MONITORING TURBINE VIBRATION | |||
Quad Cities 2 | 0 | REFUELING OUTAGE |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 0 | 04/01/2012 | MAINTENANCE OUTAGE | * | |
Cooper | 100 | ||||
Diablo Canyon 1 | 55 | BACKWASHING MAIN CONDENSER; MORRO BAY MIDWAY #1 230 KV LINE OOS FOR MAINTENANCE TILL JUNE | * | ||
Diablo Canyon 2 | 100 | MORRO BAY MIDWAY #1 230 KV LINE OOS FOR MAINTENANCE TILL JUNE | * | ||
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
Grand Gulf 1 | 0 | 02/19/2012 | REFUELING OUTAGE | ||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 0 | 03/16/2012 | LOADING FUEL IN CORE | * | |
River Bend 1 | 100 | ||||
San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR | * | |
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 11/28/2011 | MAINTENANCE OUTAGE | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021