Skip to main content

The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.

Power Reactor Status Report for January 21, 2012

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 92   DEGRADED CONDENSATE BOOSTER PUMP *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100     *  
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 92   "C" CONDENSATE PUMP WORK *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 60   REDUCED POWER FOR CONDENSER TUBE LEAK REPAIR *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 78   GENERATOR STATOR WATER COOLING SYSTEM CLEANING *  
Susquehanna 1 99   100% ELECTRICAL CAPABILITY    
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED - CONTAINMENT TENSIONING ON HOLD    
Farley 1 1   PLANT STARTUP IN PROGRESS *  
Farley 2 100        
Harris 1 100        
Hatch 1 92   COASTDOWN TO REFUELING OUTAGE    
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 01/17/2012 REFULEING OUTAGE    
Saint Lucie 1 0 11/27/2011 REFUELING OUTAGE - DEFUELED    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100   SLIGHTLY REDUCED TO 99.5% POWER FOR FEEDWATER FLOW INSTRUMENT INVESTIGATION    
Byron 2 100   SLIGHTLY REDUCED TO 99.8% POWER FOR FEEDWATER FLOW INSTRUMENT INVESTIGATION    
Clinton 97   100% ELECTRICAL GENERATION    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE    
Grand Gulf 1 96   POWER LIMITED BASED ON SECOND STAGE MSR ISOLATED    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 80   CONTROL ROD ADJUSTMENTS *  
San Onofre 2 0 01/09/2012 REFUELING OUTAGE    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 0 11/28/2011 MAINTENANCE OUTAGE    
Waterford 3 100        
Wolf Creek 1 0 01/13/2012 LOSS OF OFFSITE POWER - STARTUP TRANSFORMERS POWERED FROM OFFSITE - SEE EN #47590    

Page Last Reviewed/Updated Tuesday, August 25, 2026

Page Last Reviewed/Updated Tuesday, August 25, 2026