Power Reactor Status Report for November 25, 2011
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | MINIMUM GENERATION ALERT | * | ||
| Beaver Valley 2 | 100 | MINIMUM GENERATION ALERT | * | ||
| Calvert Cliffs 1 | 100 | HIGH SYSTEM VOLTAGE MINIMUM GENERATION ALERT | * | ||
| Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE MINIMUM GENERATION ALERT | * | ||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 75 | INCREASING POWER | * | ||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 5 | STARTUP - PREPARING TO SYNC TO GRID | * | ||
| Salem 1 | 98 | HOLDING POWER | * | ||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 99 | 100% ELECTRICAL CAPABILITY HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT | * | ||
| Susquehanna 2 | 100 | HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT | * | ||
| Three Mile Island 1 | 6 | STARTUP - PREPARING TO SYNC TO GRID | * | ||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | 161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE | |||
| Browns Ferry 2 | 100 | 161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE | |||
| Browns Ferry 3 | 100 | 161KV TRINITY LINE OOS FOR SCHEDULED MAINTENANCE | |||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 0 | 11/15/2011 | MAINTENANCE OUTAGE - SEE EN #47444 AND EN #47452 | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED; CONTAINMENT TENSIONING ON HOLD | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 74 | INCREASING POWER | * | ||
| Oconee 1 | 100 | * | |||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 65 | COASTDOWN TO REFUELING OUTAGE/OUTAGE PREPS; 1A1 CIRC WATER PUMP OOS UNTIL THE OUTAGE | |||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 0 | 11/24/2011 | REPAIR OF SAFETY VALVE | * | |
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 09/30/2011 | PREPARING FOR STARTUP MINIMUM GENERATION ALERT | * | |
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 100 | ||||
| Kewaunee | 93 | HEATER DRAIN PUMP "A" TRIP | * | ||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 0 | 11/19/2011 | SEE EN# 47460. | ||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 0 | 10/02/2011 | EXIT REFUELING OUTAGE | ||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | MINIMUM GENERATION ALERT | * | ||
| Quad Cities 2 | 100 | MINIMUM GENERATION ALERT | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 98 | WAITING FOR XENON TO STABILIZE | * | ||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 7 | WARMING THE MAIN TURBINE | * | ||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 04/09/2011 | EXITING REFUELING OUTAGE | ||
| Grand Gulf 1 | 96 | SECOND STAGE MSR ISOLATED | * | ||
| Palo Verde 1 | 0 | 10/07/2011 | EN #47472 | ||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | * | |||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |