Power Reactor Status Report for December 12, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 82 | CONDENSER TUBE LEAK REPAIRS COLD WEATHER WARNING ANTICIPATED ON 12/13 | |||
| Beaver Valley 2 | 100 | COLD WEATHER WARNING ANTICIPATED ON 12/13 | |||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | * | |||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 55 | HOLDING TO REPAIR LEAK IN 4A FEEDWATER HEATER | * | ||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 42 | INCREASING POWER TO 55% WHILE SPARE TRANSFORMER IS PLACED IN SERVICE | * | ||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 98 | GENERATOR LIMIT | |||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | * | |||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 80 | INCREASING POWER | * | ||
| Catawba 1 | 97 | PORV STROKE TESTING | * | ||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | CONTAINMENT TENSIONER ASSESSMENT IN PROGRESS | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 40 | LICENSEE INVESTIGATING FEEDPUMP TRIP | * | ||
| Hatch 2 | 89 | ROD PATTERN ADJUSTMENT AND MONTHLY TURBINE TESTING | * | ||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 0 | 12/09/2010 | CONDENSER REPAIRS. SEE EN# 46471. | ||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 98 | INTEGRATED PLANT COMPUTER OUTAGE | |||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | COLD WEATHER WARNING ANTICIPATED ON 12/13 | |||
| Braidwood 2 | 100 | COLD WEATHER WARNING ANTICIPATED ON 12/13 | |||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | * | |||
| Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
| Duane Arnold | 77 | INCREASING POWER | * | ||
| Fermi 2 | 60 | CONDENSER HOTWELL PUMP MOTOR REPLACEMENT | |||
| Kewaunee | 100 | ||||
| La Salle 1 | 76 | PLANNING FOR ROD SEQUENCE EXCHANGE & MAINTENANCE COLD WEATHER WARNING ANTICIPATED ON 12/13 | * | ||
| La Salle 2 | 100 | COLD WEATHER WARNING ANTICIPATED ON 12/13 | |||
| Monticello | 100 | ||||
| Palisades | 90 | INCREASING POWER | * | ||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 95 | INCREASING POWER AFTER TURBINE TESTING | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | * | |||
| San Onofre 3 | 0 | 10/09/2010 | DEFUELED | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 | * |