The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for December 11, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 82 | CONDENSER TUBE LEAK REPAIRS COLD WEATHER WARNING ANTICIPATED ON 12/13 | * | ||
| Beaver Valley 2 | 100 | COLD WEATHER WARNING ANTICIPATED ON 12/13 | * | ||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Ginna | 100 | ||||
| Hope Creek 1 | 97 | INCREASING POWER | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 25 | GENERATOR OFFLINE FOR MAIN TRANSFORMER REPAIR | |||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 98 | GENERATOR LIMIT | |||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 60 | SCRAM TIME TESTING AND ROD PATTERN ADJUSTMENT | * | ||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 67 | CONDUCTING SCHEDULED MAINTENANCE | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | CONTAINMENT TENSIONER ASSESSMENT IN PROGRESS | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 0 | 12/09/2010 | CONDENSER REPAIRS. SEE EN# 46471. | * | |
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 98 | INTEGRATED PLANT COMPUTER OUTAGE | |||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | COLD WEATHER WARNING ANTICIPATED ON 12/13 | * | ||
| Braidwood 2 | 100 | COLD WEATHER WARNING ANTICIPATED ON 12/13 | * | ||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 66 | HOLDING FOR PLANNED ROD SEQUENCE EXCHANGE & MAINTENANCE | * | ||
| Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | |||
| Duane Arnold | 69 | INCREASING POWER; PRE-CONDITIONING | * | ||
| Fermi 2 | 60 | CONDENSER HOTWELL PUMP MOTOR REPLACEMENT | |||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | COLD WEATHER WARNING ANTICIPATED ON 12/13 | * | ||
| La Salle 2 | 100 | COLD WEATHER WARNING ANTICIPATED ON 12/13 | * | ||
| Monticello | 100 | ||||
| Palisades | 82 | CONTAINMENT AIR COOLER FAN MOTOR REPLACEMENT | |||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 99 | FOURTH POINT HEATER TUBE LEAK REPAIRS | |||
| San Onofre 3 | 0 | 10/09/2010 | DEFUELED | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 72 | INCREASING POWER |
Page Last Reviewed/Updated Tuesday, August 25, 2026