Power Reactor Status Report for November 21, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | * | |||
| Calvert Cliffs 2 | 100 | * | |||
| FitzPatrick | 55 | HOLDING WHILE PERFORMING WORK ON RX FEEDPUMP "A" | * | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | * | |||
| Indian Point 2 | 0 | 11/07/2010 | RX CRITICAL ON TUESDAY 23NOV10 | * | |
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 0 | 11/19/2010 | RX CRITICAL ON DAYSHIFT SUNDAY 21NOV10 | * | |
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 0 | 10/31/2010 | REFUELING OUTAGE | * | |
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 90 | INCREASING POWER | * | ||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 99 | GENERATOR LIMIT | |||
| Susquehanna 2 | 94 | ONE CONTROL ROD TO BE TESTED FOLLOWING ROD SEQUENCE EXCHANGE | * | ||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 11/06/2010 | REFUELING OUTAGE | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | * | |||
| Catawba 1 | 47 | HOLDING TO PLACE FEEDPUMP IN SERVICE FOLLOWING STEAM LEAK REPAIR | * | ||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | CORE RELOAD IN PROGRESS | * | |
| Farley 1 | 60 | RAMPING UP AT 0.4 MW/MIN FOLLOWING FLUX MAPPING | * | ||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 73 | HOLDING WHILE INVESTIGATING FEEDWATER SWINGS | * | ||
| Robinson 2 | 100 | * | |||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | * | |||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 0 | 10/23/2010 | REFUELING OUTAGE | ||
| Surry 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 0 | 10/05/2010 | DEFUELED | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 0 | 10/31/2010 | REFUELING OUTAGE | ||
| Duane Arnold | 0 | 10/23/2010 | REFUELING OUTAGE | ||
| Fermi 2 | 0 | 10/24/2010 | REFUELING OUTAGE | ||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 0 | 11/17/2010 | MAINTENANCE OUTAGE | ||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 96 | CONTROL ROD TESTING | * | ||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 54 | RECIRCULATION PUMP-B TRIP DIV II EDG OUTAGE | * | ||
| San Onofre 2 | 100 | SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL | |||
| San Onofre 3 | 0 | 10/09/2010 | DEFUELED - SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 0 | 11/03/2010 | MAINTENANCE OUTAGE | ||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |