Power Reactor Status Report for November 12, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 18 | INCREASING POWER | * | ||
Indian Point 2 | 0 | 11/07/2010 | FORCED OUTAGE | ||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 0 | 11/10/2010 | FORCED OUTAGE - AUTO RX SCRAM - SEE EN #46409 | * | |
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 0 | 10/31/2010 | REFUELING OUTAGE | ||
Peach Bottom 2 | 100 | ONE OF THREE STARTUP LINES OOS FOR TRANSFORMER MAINTENANCE | |||
Peach Bottom 3 | 100 | ONE OF THREE STARTUP LINES OOS FOR TRANSFORMER MAINTENANCE | |||
Pilgrim 1 | 100 | * | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | * | |||
Susquehanna 1 | 99 | MAX ELECTRICAL OUTPUT | * | ||
Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 74 | INCREASING POWER | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 11/06/2010 | REFUELING OUTAGE | ||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
Farley 1 | 0 | 10/10/2010 | REFUELING OUTAGE | ||
Farley 2 | 100 | ||||
Harris 1 | 7 | HOLD FOR GENERATOR TEST | * | ||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 0 | 10/22/2010 | CORE RELOAD COMPLETED | ||
Robinson 2 | 0 | 10/06/2010 | MAINTENANCE OUTAGE | ||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 0 | 10/01/2010 | EXIT REFUELING OUTAGE | * | |
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 0 | 10/23/2010 | DEFUELED | ||
Surry 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Turkey Point 3 | 80 | INCREASING POWER | * | ||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 96 | HOLDING POWER FOR FUEL SOAK | |||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 50 | REDUCING POWER TO 20-25% FOR CONTAINMENT ENTRY BETWEEN 0600-0700 HRS | * | ||
D.C. Cook 2 | 0 | 10/05/2010 | DEFUELED | ||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | ||||
Dresden 3 | 0 | 10/31/2010 | REFUELING OUTAGE | ||
Duane Arnold | 0 | 10/23/2010 | REFUELING OUTAGE | ||
Fermi 2 | 0 | 10/24/2010 | REFUELING OUTAGE | ||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 48 | REDUCED POWER TO ISOLATE THE 'B' HIGH PRESSURE FEEDWATER HEATER STRING | * | ||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 95 | REDUCED POWER FOR REPAIR OF HEATER DRAIN TANK PUMP | |||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 2 | HOLDING POWER TO RESOLVE AUX FEED ISSUE - 500KV DIABLO MIDWAY LINE #2 OOS FROM 0600 HRS 11/12 TIL 11/14 | * | ||
Diablo Canyon 2 | 100 | 500KV DIABLO MIDWAY LINE #2 OOS FROM 0600 HRS 11/12 TIL 11/14 | * | ||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 25 | INCREASING POWER TO 100% | * | ||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL | |||
San Onofre 3 | 0 | 10/09/2010 | DEFUELED - SWITCHYARD RESTRICTIONS - NO MAINTENANCE WITHOUT SHIFT MANAGER APPROVAL | ||
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 11/03/2010 | MAINTENANCE OUTAGE | * | |
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021