Power Reactor Status Report for October 9, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 0 | 10/01/2010 | REFUELING OUTAGE | * | |
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 0 | 09/12/2010 | EXITING REFUELING OUTAGE | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 98 | COASTDOWN TO REFUELING OUTAGE | |||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 32 | INCREASING POWER | * | ||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 44 | HOLDING POWER WHILE 4TH STAGE FW HEATER INLET VALVE MAINTENANCE IS IN PROGRESS. | * | ||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | 357 KV NO LEADING VARS AT DISPATCH REQUEST | |||
| Susquehanna 1 | 75 | INCREASING POWER FOLLOWING A ROD SEQUENCE EXCHANGE | * | ||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 92 | HOLDING FOR TURBINE CONTROL VALVE TESTING/ROD PATTERN ADJUSTMENT | * | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 65 | HOLDING FOR ROD SEQUENCE EXCHANGE | * | ||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 0 | 09/17/2010 | REFUELING OUTAGE | ||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
| Farley 1 | 79 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Farley 2 | 100 | ||||
| Harris 1 | 0 | 10/01/2010 | REFUELING OUTAGE | ||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 0 | 09/11/2010 | EXITING REFUELING OUTAGE | ||
| North Anna 2 | 0 | 09/28/2010 | FORCED OUTAGE - SEE EN #46294 | ||
| Oconee 1 | 95 | INCREASING POWER FOLLOWING SCHEDULED CONTROL VALVE MOVEMENT | * | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 0 | 10/06/2010 | RCS LOW FLOW IN ONE LOOP EN# 46313 | ||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 0 | 10/01/2010 | REFUELING OUTAGE | ||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 0 | 09/25/2010 | DEFUELED | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 98 | REMOVAL OF SPDS UNTIL 10/20/10. | |||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 0 | 10/03/2010 | REFUELING OUTAGE | ||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 0 | 10/05/2010 | ENTERING REFUELING OUTAGE | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 95 | COASTDOWN TO REFUELING OUTAGE. | * | ||
| Duane Arnold | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 95 | REDUCED POWER TO EVALUATE FEEDWATER HEATER TUBE LEAKS. | |||
| Palisades | 0 | 10/03/2010 | ENTERING REFUELING OUTAGE | ||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 98 | MEASUREMENT UNCERTAINTY RECAPTURE UPRATE | |||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 0 | 10/02/2010 | REFUELING OUTAGE | ||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 0 | 10/01/2010 | REFUELING OUTAGE | ||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 95 | HEATER DRAIN PUMP MAINTENANCE | * | ||
| San Onofre 3 | 82 | COASTDOWN TO REFUELING OUTAGE | |||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 0 | 10/05/2010 | TECH SPEC SHUTDOWN. SEE EN#46309. |
Page Last Reviewed/Updated Tuesday, August 25, 2026