Power Reactor Status Report for October 8, 2010

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 10/01/2010 ENTERING REFUELING OUTAGE    
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 0 09/12/2010 EXITING REFUELING OUTAGE    
Ginna 100        
Hope Creek 1 98   COASTDOWN TO REFUELING OUTAGE *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 4   STARTING UP - CRITICAL *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 97   4TH STAGE FW HEATER INLET VALVE MAINTENANCE. *  
Salem 2 100        
Seabrook 1 100   357 KV NO LEADING VARS AT DISPATCH REQUEST    
Susquehanna 1 100        
Susquehanna 2 94   100% ELECTRICAL CAPABILITY    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 0 09/17/2010 REFUELING OUTAGE    
Crystal River 3 0 09/25/2009 DEFUELED    
Farley 1 81   COASTDOWN TO REFUELING OUTAGE *  
Farley 2 100        
Harris 1 0 10/01/2010 REFUELING OUTAGE    
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 09/11/2010 EXITING REFUELING OUTAGE    
North Anna 2 0 09/28/2010 FORCED OUTAGE - SEE EN #46294    
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 10/06/2010 RCS LOW FLOW IN ONE LOOP EN# 46313    
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 0 10/01/2010 REFUELING OUTAGE *  
Sequoyah 2 100        
Summer 100        
Surry 1 99   COASTDOWN TO REFUELING OUTAGE *  
Surry 2 100        
Turkey Point 3 0 09/25/2010 DEFUELED    
Turkey Point 4 100        
Vogtle 1 98   REMOVAL OF SPDS UNTIL 10/20/10.    
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 10/03/2010 REFUELING OUTAGE    
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 0 10/05/2010 ENTERING REFUELING OUTAGE    
Davis-Besse 100        
Dresden 2 100        
Dresden 3 96   COASTDOWN TO REFUELING OUTAGE.    
Duane Arnold 99   FUEL CONDITIONING *  
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 95   REDUCED POWER TO EVALUATE FEEDWATER HEATER TUBE LEAKS.    
Palisades 0 10/03/2010 ENTERING REFUELING OUTAGE *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 98   MEASUREMENT UNCERTAINTY RECAPTURE UPRATE    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 0 10/02/2010 REFUELING OUTAGE    
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 10/01/2010 REFUELING OUTAGE *  
River Bend 1 100        
San Onofre 2 94   HEATER DRAIN PUMP MAINTENANCE    
San Onofre 3 82   COASTDOWN TO REFUELING OUTAGE *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 10/05/2010 TECH SPEC SHUTDOWN. SEE EN#46309.    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021